Laserfiche WebLink
w+MSer courm <br />May 15, 1989 <br />RAMSEY COUNTY <br />PARKS & RECREATION DEPARTMENT <br />2015 N. Van Dyke Street Telephone (612) 7771707 <br />Maplewood, Minnesota 55109-3796 <br />Gregory A. Mack, Director <br />Mr. Morrie Anderson <br />Director <br />New Brighton Parks and Recreation Dept. <br />1975 Silver Lake Road <br />>`dew B~^i ghton, Minnesota 55112 <br />Dear Mr. Anderson:. <br />As per your request of May 8, 1989, I have calculated the estimated project <br />cost for a recreational bridge crossing of Rice Creek at Mississippi Street <br />and a paved trail segment from the proposed bridge southward to an <br />intersection with the internal parkway. Refer to attached map. <br />The following estimates, submitted for your review and consideration, <br />include the estimated costs of materials, labor, equipment and contingency <br />reserve necessary to complete the respective projects. <br />Project No. 1 - Clear span Cor-Ten steel recreational bridge <br />(10 ft. wide x 100 ft. long) - includes grading, shoreline <br />stabilization, piling, footings, bridge and installation. <br />Lump Sum Estimate $44,000.00* <br />*There are some unknowns at this point since a survey <br />and engineering has not been done relative to shoreline <br />stabilization and piling needs. <br />Project No. 2 - Bituminous trail segment (10 ft. wide x <br />1800 ft. long) with turf shoulders - includes stump <br />removal and disposal, grading, pavement and turf <br />establishment. Any additional trail alignment could <br />be constructed for $8.80 per linear foot. <br />Lump Sum Estimate $21,200.00 <br />Sincerely, <br />Ken Simons <br />Landscape Architect <br />Attachments <br />a6 `" S <br />