Laserfiche WebLink
28-Feb-89 <br />CITY.OF NEW BRIGHTON <br />ENGINEERS ESTIMATE , <br />PIKE-LAKE WALKWAY <br /> EST. UNIT <br />ITEM QUAN. UNIT PRICE TOTAL <br />CHURCH DRIVEWAY- <br />REMOVE BIT. SURFACE 354 S.Y. $1.00 5354.00 <br />2341 BITUMINOUS MAT. FOR MIX. 2 TON $150.00 $300.00 <br />2341 WEARING COURSE 41 TON $21.00 58.61.00 <br />AGGREGATE BASE, CLASS 5 -119 TON $1@.0@ $1,190.00 <br />CONCRETE CURB, V6 363 L.F. 510..00 53,630.00 <br />SUB-TOTAL 56,335.00 <br />CONTINGENCIES 5633.50 <br />TOTAL $6,968.50 <br />WALKWAY- <br />COMMON EXCAVATION 540 C.Y. 58.00 54,320.00 <br />COMMON BORROW 675 C.Y. $4.00 52,700.00 <br />2341 BITUMINOUS MAT. FOR MIX. 15 TON 5150.00 52,250.00 <br />2341 WEARING COURSE 243 TON $21.00 $5,103.00 <br />AGGREGATE BASE, CLASS 5 696 TON $10.00 $b,960.00 <br />REMOVE-CONC. CURB 20 L.F. $5.00 $100.00 <br />CONC. CURB, B618 20 L.F. $17.00 <br />-- $340.00 <br />--------- <br />--- <br />SUB-TOTAL - <br />$21,773.00 <br />CONTINGENCIES $2,177.30 <br />TOTAL $23,950.30 <br />TURF ESTABLISHMENT- <br />SOD WlTOPSOIL 1054 S.Y. 53.00 $3,162.00 <br />SEEDING W/MULCH 1.36 ACRE $1,500.00 $2,040.00 <br />--------------- <br />SUB-TOTAL $5,202.00 <br />CONTINGENCIES $520.20 <br />TOTAL $5,722.20 <br />TOTAL CONSTRUCTION COST $33,310.00 <br />CONTINGENCIES 53,331.00 <br />--------------- <br />TOTAL PROJECT COST 536,641.00 <br />