Laserfiche WebLink
28-Feb-89 <br />CITY OF NEW BRIGHTON <br />ENGINEERS ESTIMATE <br />PIKE LAKE WALKWAY <br /> EST. UNIT <br />ITEM QUAN. UNIT PRLCE TOTAL <br />CHURCH DRIVEWAY- <br />REMOVE BIT. SURFACE 354 S.Y. $1.00 $354.00 <br />2341 BITUMINOUS MAT. FOR MIX. 2 TON $150.00 $3.00.00 <br />2341 WEARING COURSE 41 TON 521.00 5861.00 <br />AGGREGATE BASE, CLASS 5 119 TON S1@.00 $1,190.00 <br />CONCRETE CURB, V6 363 L.F. 510.00 .$3,630.00 <br />SUB-TOTAL <br />CONTINGENCIES <br />TOTAL <br />WALKWAY- <br />COMMON EXCAVATION 540 C.Y. 58.00 <br />COMMON BORROW 675 C.Y. 54.00 <br />2341 BITUMINOUS MAT. FOR MIX. 15 TON $150.00 <br />2341 WEARING COURSE 243 TON 521.00 <br />AGGREGATE BASE, CLASS 5 696 TON $1@.@0 <br />REMOVE CONC. CURB 20 L.F. $5.00 <br />CONC. CURB, B618 20 L.F. $17.00 <br />SUB-TOTAL <br />CONTINGENCIES <br />TOTAL <br />TURF ESTABLISHMENT- <br />SOD W/TOPSOIL <br />SEEDING W/MULCH <br />SUB-TOTAL <br />CONTINGENCIES <br />TOTAL <br />1054 S.Y. 53.00 <br />1.36 ACRE $1,500.00 <br />TOTAL CONSTRUCTION COST <br />CONTINGENCIES <br />TOTAL PROJECT COST <br />56,335.00 <br />$633.50 <br />--------------- <br />.$6,968.50 <br />54,320.00 <br />$2,700.00 <br />$2,250.00 <br />$5,103.00 <br />$6,960.00 <br />$100.00 <br />$34@.00 <br />$21,773.00 <br />$2,177.30 <br />523,950.30 <br />$3,162.00 <br />$2,040.00 <br />--------------- <br />55,202.00 <br />$520.20 <br />55,722.20 <br />$33,310.00 <br />$3,331.00 <br />--------------- <br />536,.641.00 <br />