My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
0140
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0100-0199
>
0140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2006 10:47:50 AM
Creation date
7/6/2005 10:04:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />C. No license shall be granted as defined in this ordinance unless the <br />installation requirements are complied with. <br />SECTION 3. Installation Requirements. <br />A. Installation Plans. <br />1. Before any installation is begun, a floor plan complete with all <br />details of the requirements herein must be submitted t 0 the Building <br />Inspector. This plan should show the building outline, location <br />of all mechanical equipment in the building, fans with their CN <br />capaci ty, etc. This plan should be accompanied wi th detailed opera- <br />tion, installation and maintenance manuels prepared by themanufact- <br />urer. of the propGSed dry cleaning machine. <br />2. Upon receiving written approval of the plans, the installation may <br />be made. <br />3. Before the machines can be put into operation for use, the installing <br />contractor must arrange for the inspection of t he equipment by the <br />Building Inspector and receive approval on saae. <br />a. Location. <br />),. Coin operated dry cleaning equipment locations l1lUst be approved by <br />the Building Inspector prior to the installation of machinery. <br />2. Approval Will not be granted for any building occupied in any part <br />as a dwelling. <br />3. Buildings should be single story structures With concrete floors in <br />good condition. Installations in buildings not having concrete floors <br /> <br />may be approved upon application provided the requirements for proper <br /> <br />ventilation, confinement of solvents within the dry cleaning service <br /> <br />area and appropriate segragation of all building areas and equipment <br />are installed and maintained to protect health. Complete information <br />about the building and its construction must be included in the plans. <br />C. General . <br />1. 'lb.e solvent shall be stored in closed containers, and should be <br />transferred from the containers in a line free of leaks. All storage <br />
The URL can be used to link to this page
Your browser does not support the video tag.