My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03_19_02
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Minutes-Board Or Commission PLZ 00900
>
2002
>
03_19_02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2007 1:28:49 PM
Creation date
5/24/2007 1:28:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PLANNING COMMISSION PROCEEDINGS <br />CITY OF NEW BRIGHTON <br /> <br /> <br />Regular Meeting 03-19-02 7:30 P.M. <br /> <br />Present: <br />Commissioners Larry Baker, Jim Baker, Thomas O’Keefe, Jeff Schopf <br />and Paul Zisla <br /> <br /> <br />Absent: <br />Commissioners David Schmitz and Norm Schiferl <br />APPROVED <br /> <br />Also Present: <br /> Patrick Boylan, City Planner <br /> Kim Moore-Sykes, City Council Member <br /> Kevin Locke, Community Development Director <br /> <br /> <br />? <br /> Minute Approval - <br /> February 19, 2002 <br />? <br /> Agenda Review - <br /> No additions <br />? <br /> Council Action - <br /> Council Member Kim Moore-Sykes <br />Reported Public Safety Building is moving along well. <br />Reported on probationary status for renewal of licenses for <br />some businesses. <br />Town Hall Meeting will be held Sat. 8:00 – 12:00 Noon. <br /> <br />Public Hearing – LP02-002 / SP02-001 <br />To consider an application for site plan review and special use permit to add three <br />antennae to an existing cellular tower. The proposed antennae would serve the existing <br />125 foot high, cellular tower at the former Darling Rendering Plant site, which is now <br />owned by the City of New Brighton. The applicant is at the meeting to ask to expand the <br />use of the cellular tower by doubling the amount of antennae on the facility and therefore <br />a special use permit process is required. Staff believes the special use will not be <br />detrimental to the public and that the application meets all the special use standards and <br />meets all the standards found in the height exceptions and staff believes the proposed <br />addition does not provide additional interference with any redevelopment efforts of the <br />northwest quadrant. <br /> <br />Dave Trost of Site Acquisition Consultants. spoke representing AT & T Wireless in the <br />request. He pointed out they are adding the antennae at the same level of the existing <br />arrays. This will not preclude any other co-locations so if there are any other applicants <br />who would need to get service in this area there is plenty of room on that tower for lease <br />as well. This would take advantage of an existing structure and provide better service <br />without having to put up another one. <br /> <br />CLOSE THE PUBLIC HEARING. <br />Moved and seconded to <br />5 Ayes, 0 Nayes, Motion Carried. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.