My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-25-2007
NewBrighton
>
Council
>
Packets
>
2007
>
CCP 06-25-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2007 12:34:57 PM
Creation date
6/25/2007 12:19:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
305
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />II ow of <br />IlmwGl-fI(N <br /> <br />the city that works for you <br /> <br />Re ort Number: <br />A enda Section: <br />Report Date June 20, 2007 <br />Council Meeting Date June 25, 2007 <br /> <br /> <br />. <br /> <br />REQUEST FOR COUNCIL CONSIDERATION <br /> <br />ITEM DESCRIPTION: CONSIDERATION OF CHANGE ORDER NO.1 TO PROJECT 07-1, <br />2007 STREET RECONSTRUCTION <br />DEPARTMENT HEAD'S APPROVAL: ~w <br /> <br />Recommendation: To approve Change rder No. 1 for Project 07-1, 2007 Street Reconstruction <br />adding the milling and overlaying of the 1694 Service Drive to the existing contract. <br /> <br /> <br />Comments attached <br /> <br />CITY MANAGER'S APPROVAL: <br />No comments to supplement this report <br /> <br />Legislative History: The City Council ordered Project 07-1, 2007 Street Reconstruction on March 27, <br />2007, and awarded a contract to North Valley, Inc. on May 22, 2007. <br /> <br />Financial Impact: Change Order No.1 increases the origin<J.1 contract amount by $22,020.61. Please <br />see the attached Change Order and Attachment. <br /> <br />Explanation: Project 07-1 consists of the reconstruction of approximately 0.6 miles of residential <br />streets in 2007. Change Order No.1 adds the milling and overlaying of the I694 Service Drive between <br />Thomdale Avenue and Silver Lake Road to the contract. <br /> <br />. <br /> <br />The Service Drive along with other streets in the Pike Lake area was reconstructed in 1984. In 2002, all <br />these streets were milled and overlaid, as a maintenance project, with exception of this portion of the <br />Service Drive. The Service Drive was omitted from the project because of the uncertainty of the impact <br />the redevelopment of the Brighton Village Shopping Center would have on its alignment and grade. We <br />did not want to spend any money fixing the street not knowing if it would be totally redone or possibly <br />eliminated as part of the redevelopment. It is now evident, with Brighton Village's site plans being <br />recently approved, there will be no impact to the Service Drive as a result of the redevelopment. The <br />road is in very poor condition at this time and in need of a more permanent fix than just routine <br />maintenance. A mill and overlay will produce a smooth riding surface and extend the life of the road. <br /> <br />The Contractor has agreed to mill and overlay the Service Drive for the same unit prices bid in the <br />contract for Project 07-1 with the only addition of a mobilization charge for moving the mill and paver <br />onto the site. The bid results show that these are very good prices and staff recommends adding the <br />Service Drive work to the original contract. <br /> <br />Costs and Funding: The cost of Change Order No.1 is recommended to be paid from Fund 422 - <br />Contract aintenance, which was set up to include this type of work. <br /> <br /> <br />. <br /> <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.