Laserfiche WebLink
~ PLANT SCHEDULE <br />I COpE QTY COMMON N,4ME/L~TIN N,4ME SIZE ROOT ~M,4RKS <br />- <br /> DECIDUOUS SHRUBS 218 PROPOSED <br />68 TOR SPRIREA 5 CONT. PLANT 3'-0" O.C. <br /> TS Spires betulifolia 'Tor' GAL. SPACE EVENLY <br /> 26 MISS KIM LILAC 5 CONT. PLANT 3'-0" O.C. <br /> MKL Syringa patula 'Miss Kim' GAL. SPACE EVENLY BUILDING LASTING RELATIONSHIPS <br /> 52 CONCORDE BARBERRY 5 CONT. PLANT 4'-0" O.C. <br /> CB Berberis thunbergii 'Concorde' GAL. SPACE EVENLY <br /> 38 WINNIPEG PARK ROSE 2 CONT. PLANT 3'-0" O.C. <br /> WPR Rosa 'Winnipeg Park' GAL. SPACE EVENLY RYAN COMPANIES US, INC. <br />7 5 11 <br />TS GOJ KFG 11 8 11 n 11 KFG GOJ CB 34 MOONSHADOW EUONYMOUS 2 CONT. PLANT 5'-0" O.C. 50 South Tenth Street, Suite 300 <br />WPR ME Euonymous fourtunei 'Moonshodow' GAL. SPACE EVENLY Minneapolis, MN 55403-2012 <br /># ~ SOD SOD 612-492-4000te1 <br /> CONIFEROUS SHRUBS 80 PROPOSED 612-492-3000 fax <br />as • o ,.9 _ SOD 47 TAUNTON YEW 5 CONT. PLANT 3'-0" O.C. <br />$ <br />j . TY Taxus x media 'Taunton' GAL. SPACE EVENLY WWW.RYANCOMPANIES.COM <br />KFG 1 GLOBE BLUE SPRUCE 7 CONT. PLANT 5'-0" O.C. <br />1 g GAL. SPACE EVENLY <br />g 11 AY 0 MKL GBS Picea pungen 'Globosa' <br />MKL Q 0 TS 15 32 GREY OWL JUNIPER 5 CONT. PLANT 5'-0" O.C. PROJECT NAME <br />AY <br />3 22 0 GOJ Juniperus virginiana 'Grey Owl' GAL. SPACE EVENLY <br />I HFG SOD <br />ROCK MULCH 14 I ORNAMENTAL GRASSES 146 PROPOSED <br />, . , , , o 56 KARL FOERSTER GRASS 1 CONT. PLANT 3'-0" O.C. <br />t tk' + ~ ~ HARDWOOD MULCH 6 <br />5 (TYP.) o GOJ KFG Calamagrotis x acutiflora 'Karl Foerster' GAL. SPACE EVENLY <br />BJS o o 18 LITTLE BLUE STEM GRASS 1 CONT. PLANT 3'-0" o.c. TRANSOMA <br />~ o I ~ ° ` o LBG Schizachyrium scoparium 'The Blues' GAL. SPACE EVENLY NORTHWEST <br />TY I * HARDWOOD MULCH <br />9 • (TYP.) 72 HAMEIN FOUNTAIN GRASS 1 CONT. PLANT 3'-0" o.c. QUADRANT <br />8 KFG <br />CB HFG Pennisetum alopecuroides 'Hameln' GAL. SPACE EVENLY LOCATION <br />8 DGING 10 <br />o AY ~ TS 15 PERENNIALS 151 PROPOSED NEW BRIGHTON, <br />I 5 a TS BJS ~ 28 MAY NIGHT SALVIA 1 CONT. PLANT 2'-O" O.C. MINNESOTA <br />8 <br />TS MNS Salvia x superba Mainacht' GAL. SPACE EVENLY <br />' ~ SOD AR W 0 UCH 84 ANTHEA YARROW 1 CONT. PLANT 2'-0" O.C. SHEET TITLE <br />6 , cP ME AY Achilles x 'Anthea' GAL. SPACE EVENLY SHRUB AND PERENNIAL <br />9 <br />I MNS 6 39 BLACK JACK SEDUM 1 CONT. PLANT 2'-0" O.C. SITE PLAN <br />~ GOJ 3 BJS Sedum spectabile 'Blackk Jack' GAL. SPACE EVENLY <br />ME TY <br />g , REVISIONS <br />3 WPR i TY ~ <br />AY ~ 07/31/07 -BID PACK #1 <br />18 ° 8 ~o ~ MNS a~ ~ LANDSCAPE NOTES o8/oa/o7 - Rc.`wD suBMITTAL <br />HFG LBG m~ ,4. 5 5 3 lg g 08/03/07 - CI1~ SUBMITTAL <br />° g . 3 WPR ME CB HFG AY 7 TS ALL LANDSCAPE TREES, SHRUB, GROUNDCOVERS AND SOD o8/0~/07 - MDH svsMlrrRL <br />ME ~ SOD AREAS SHALL BE IRRIGATED. OS/13/07 - RCWD COMMENT <br />~ WPR 1 • • ALL LANDSCAPE ISLANDS WITH PLANT MATERIAL SHALL BE IRRIGATED. CITY COMMENT <br />9 ~ 3 GBS « • • REFER TO LANDSCAPE DETAIL SHEET FOR GENERAL PLANTING 08/15/07 - MDH PLUMBING SUBMITTAL, <br />TY ME + 12 i'~'" NOTES, IRRIGATION NOTES, PLANTING DETAILS. 08/24/07 -BUILDING PERMIT SUBMITTAL <br />12 HARDWOOD MULCH ~o TY 10 ~ • ~ REFER TO GRADING PLAN FOR GRADES AND EROSION CONTROL <br />BJS o ~o (TYP.) 8 ~ KFG , <br />W~ • TY 14 ARDWOOD MULCH • LANDSCAPE CONTRACTOR SHALL SUBMIT A SHOP DRAWING OF IRRIGATION <br />/ ~ AY BJS TYP. PLAN TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL. <br /> • ALL SHRUB BEDS AND PARKING LOT ISLANDS TO RECEIVE 4" SHREDDED HARDWOOD <br />CB OD 1 ~ 11 MULCH, AND TREES TO RECEIVE 4" DEPTH OF SHREDDED HARDWOOD MULCH. <br />EDGING ° ~ ~ TS • 12 • REMOVE WIRING, TWINE OR ROPES AND BURLAP FROM THE TOP AND SIDES OF <br />AY ; ; 7 THE ROOT BALL FOR BALLED AND BURLAPPED PLANTS. <br />3 MKL mo N W~ I hereby certify that this plan, specification, <br />ROCK MULCH HFG • REMOVE CONTAINERS AND CUT CIRCLING ROOTS IF PLANTS ARE or report was prepared by me or under my <br />/ (TYP.) p CONTAINER GROWN. direct supervision and that I am a duly <br />6 • • HEAVY COMMERCIAL GRADE EDGING SHALL BE USED AROUND THE PERIMETER Licensed Landscape Architect under the <br />N~ V OF ALL SHRUB AND GROUNDCOVER MASSINGS laws of the State of Minnesota. <br />1 W~ <br />10 • MNS ° • ALL TREES NOT IN PLANTING BEDS TO RECEIVE MULCH RINGS 4 IN DIA. RIDGE, NOT FLUSH WITH THE BARK. <br />~ SOD 6 <br />6 • WPR ~ MULCH DEPTH SHALL BE A MAXIMUM OF FOUR INCHES, AND <br />KFG 6 SHALL BE KEPT AT LEAST TWO INCHES AWAY FROM THE STEM OF THE TREES. <br />ME ~ 6 Peter W. cEn <br />~ BJS • THE LANDSCAPE CONTRACTOR SHALL REPAIR ALL DAMAGE TO <br />6 SOD 8 • TY TS .ooTOP THE SITE CAUSED BY THE PLANTING OPERATION AT NO COST <br />_ ~ TOP 888.OOBOT TO THE OWNER. <br />~ 2.00 901. 5 T P ~ ~ TOP 890.2080T <br />` 899 OB T 893',OOBOT • • ALL PLANTINGS SHALL RECEIVE FERTILIZER AS FOLLOWS: (NO <br />~ ~ ~ .30 TOP - ~ ~ 894.50 BOi PHOSPHORUS) *10-0-20 GRANULAR FERTILIZER APPLIED AT #42932 08 / 24 / 2007 <br /> THE TIME OF PLANTING AT A RATE OF 12 OZ PER 2.5 <br />896A0 BOT CALIPER INCHES OF TREE AND 6 OZ PER SHRUB. *10-0-10 ©2006 RYAN COMPANIES US, INC. <br />FERTILIZER APPLIED THE FOLLOWING SPRING AT SAME RATE. <br />• • ALL BOULDERS USED SHALL BE REVIEWED AND APPROVED BY <br /> LANDSCAPE ARCHITECT. QUANITIES VERIFIED ON L5. JOB NUMBER HISTORY <br />10 23 KW BJG 10 <br />~ R,ir, BJG ~ • ALL DISTRUBED AREAS SHALL BE SODDED AND IRRIGATED UNLESS DEFINED OTHERWISE. <br />SHEET NUMBER <br />L2 <br />DRAWN BY CHECKED BY <br />O 40 so CLH PWM <br />JOB NUMBER DATE <br />SCALE IN FEET 1735-000 os ~ 24 ~ 2007 <br />