<br />CITY OF NEW BRIGHTON
<br />ENGINEERING DEPARTMENT
<br />NORTHWEST QUADRANT PHASE I
<br />PROJECT NO. 06-1, NORTHWEST QUADRANT PHASE I UTILITIES,
<br />STREETS, STREETSCAPE, AND STREET LIGHTING
<br />PARTIAL PAYMENT 10
<br />DATE: 8/31107
<br />CONTRACTOR: NORTHDALE CONSTRUCTION CO. INC.
<br />14450 NORTHDALE BOULEVARD
<br />ROGERS, MN 55374
<br />(763)428-4868
<br />FAX: (763)428-4997
<br />FUND: 491-40601-6751
<br />SECTION A - STORM WATER POLLUTION PREVE
<br />SECTION B - REMOVALS AND INPLACE ABANDO
<br />SECTION C - SANITARY SEWER SYSTEM INSTAL
<br />SECTION D - WATERMAIN SYSTEM INSTALLATIC
<br />SECTION E - STORM SEWER SYSTEM INSTALLA
<br />SECTION F - STREET INSTALLATION
<br />SECTION G - SIDEWALK AND TRAIL INSTALLATI(
<br />SECTION H - STREETSCAPE INSTALLATION
<br />SECTION I - STREET LIGHT INSTALLATION
<br />SECTION J - FIBER OPTICS CONDUIT INSTALLAT
<br />EXTRA - PRIVATE UTILITY CONDUITS
<br />TOTAL
<br />$12,575.00
<br />$57,544.00
<br />$174,021.43
<br />$246,352.69
<br />$148,583.23
<br />$170,608.23
<br />$0.00
<br />$84,848.06
<br />$193,864.00
<br />$0.00
<br />$5,922.12_
<br />$1,094,318.77
<br />PAGE 1 OF 3
<br />ITEM SECTION A - STORM WATER POLLUTION PREVENTION ESTIMATED UNIT PRICE QUANTITY
<br />NO ITEM QUANTITY UNIT BID TO DATE TOTAL
<br />2573.502
<br />2573.601
<br />2573.602
<br />2575.601 SILT FENCE
<br />EROSION CONTROL SUPERVISOR
<br />INLET PROTECTION
<br />EROSION CONTROL 100
<br />1
<br />21
<br />1 LF
<br />LS
<br />EA
<br />LS $4.50
<br />$5,500.00
<br />$125.00
<br />$9,500.00 100.00
<br />0.75
<br />7.00
<br />0.75 $450.00
<br />$4,125.00
<br />$875,00
<br />$7,125.00
<br /> SUB-TOTAL $12,575.00
<br />ITEM SECTION B - REMOVALS AND INPLACE ABANDONMENTS
<br />NO ITEM
<br />2021.501 MOBILIZATION 1 LS $45,450.00 1.00 $45,450.00
<br />2104.501
<br />2104.501
<br />2104.51)9 REMOVE CONCRETE CURB AND GUTTER
<br />REMOVE UTILITY PIPE
<br />REMOVE MANHOLE 200
<br />55
<br />2 LF
<br />LF
<br />EA $4.50
<br />$10.50
<br />$500.00 98.00
<br />
<br />2.00 $441.00
<br />$0.00
<br />$1,000.00
<br />2104.503 REMOVE CONCRETE SIDEWALK 900 SF $1.50 594.00 $891.00
<br />2104.525
<br />2104.525 INPLACE ABANDONMENT 12" WATERMAIN PIPE
<br />INPLACE ABANDONMENT 21" SANITARY SEWER PIPE 560
<br />260 LF
<br />LF $7.45
<br />$21.5D 560.00
<br />260.00 $4,172.00
<br />$5 590.00
<br /> SUB-TOTAL $57,544.00
<br />ITEM SECTION C - SANITARY SEWER SYSTEM INSTALLATION
<br />NO ITEM
<br />2503.602 CONNECT TO EXISTING SANITARY SEWER MANHOLE 1 EA $24,500.00 1.00 $24,500.00
<br />2503.511 8" PVC SANITARY SEWER PIPE SDR 35 12'-14' DEEP 127 LF $24.95 333.00 $8,306.35
<br />2503.511 8" PVC SANITARY SEWER PIPE SDR 35 14'-16' DEEP 176 LF $24.95 176.00 $4,391.20
<br />2503,511
<br />2503.511 10" PVC SANITARY SEWER PIPE SDR 35 12'-14' DEEP
<br />10" PVC SANITARY SEWER PIPE SDR 35 14'-16' DEEP 105
<br />823 LF
<br />LF $58.10
<br />$58.10 100.00
<br />823.00 $5,810.00
<br />$47,816.30
<br />2503.511 12" PVC SANITARY SEWER PIPE SDR 35 0-10' DEEP 25 LF $63.83 36.00 $2,297.88
<br />2503.511
<br />2503.511
<br />2503.511 12" PVC SANITARY SEWER PIPE SDR 35 10'-12' DEEP
<br />12" PVC SANITARY SEWER PIPE SDR 35 12'-14' DEEP
<br />12" PVC SANITARY SEWER PIPE SDR 35 14'-16' DEEP 376
<br />80
<br />145 LF
<br />LF
<br />LF $63.83
<br />$63.83
<br />$63.83 376.00
<br />80.00
<br />145.OD $24,000,0a
<br />$5,106.40
<br />$9,255.35
<br />2506.502 48" SANITARY SEWER MANHOLE 7.0 EA $1,928.41 9.00
<br />.69
<br />$17,355
<br />2503.603
<br />2503.511 SANITARY SEWER MANHOLE OVERDEPTH
<br />6" PVC SEWER SERVICE PIPE 36.6
<br />105.0 LF
<br />LF $112.96
<br />$23.39 3920
<br />115.00 $4,428.03
<br />$2,689.85
<br />2503.511 8" PVC SEWER SERVICE PIPE 495.0 LF $24.87 505.00 $12,559.35
<br />2503.511 8" X 6" SANITARY SEWER SERVICE CONNECTION 3.0 EA $111.24 4.00 $444.96
<br />2503.511 10" X 8" SANITARY SEWER SERVICE CONNECTION 9.0 EA $323.35 9.00 $2,910.151
<br />2503.511
<br />2503.511 6" SANITARY SEWER SERVICE TO MANHOLE
<br />8" SANITARY SEWER SERVICE TO MANHOLE 1.0
<br />1.0 EA
<br />EA $125.00
<br />$125.00 0.00
<br />0.00 $0.00
<br />$0.00
<br />2506.602 INFILTRATION/INFLOW BARRIERS FOR CASTINGS & RINGS 7.0 EA $140.21 4.D0 $560.84
<br />EXTRA REWORK MH 6 LS $793.50 1.00 $793.50
<br />EXTRA REWORK MH 7 IS $793.50 1.00 $793,50
<br /> SUB-TOTAL $174,021.43
<br />ITEM SECTION D . WATERMAIN SYSTEM INSTALLATION
<br />NO ITEM
<br />2504.602 CONNECT TO EXI57 WATERMAIN W 12" FUSION WELD MJ ADAPTERS 2 EA $2,286.44 2.00 $4,572.88
<br />2504.603 12" HDPE WATERMAIN 765.0 LF $72.66 65320 $47,592.15
<br />2504.603 RECONNECT HYD TO HDPE WM W 6" FUSION WELD MJ ADAPTER 1 EA $2,006.25 1.00 $2,00625
<br />2504.603
<br />2504.603 RECONNECT 1-1/2" COPPER SERVICE W FUSION WELD CORP SADDLE
<br />REMOVE 12" WATERMAIN FROM 30" CASING UNDER RAILROAD 1
<br />1 EA
<br />LS $1,139.72
<br />$7,500.00 1.00
<br />1.00 $1,139.72
<br />$7,500.00
<br />2504.603 6" PVC WATERMAIN 0900 650.0 LF $20.77 548,00 $11,381.96
<br />25D4.603 8" PVC WATERMAIN C900 75.0 LF $23.89 78.00 111 863.42
<br />2504.603 10" PVC WATERMAIN C900 320.0 LF $22.17 293.00 $6,495.81
<br />2504.603
<br />2504.603 12" PVC WATERMAIN C900
<br />1" CORPORATION STOP & STAINLESS STEEL SADDLE 525.0
<br />
<br />1
<br />1.0 LF
<br />EA $26.58
<br />$189.47 1,723.50
<br />0.00 $45,810.63
<br />$0.00
<br />2504.603 1" COPPER WATER SERVICE PIPE 50.0 LF $23.93 0.00 $0.00
<br />2504.603 1" CURB STOP & BOX 1.0 EA $206.86 0.00 $0.00
<br />2504.603 4" PVC WATER SERVICE PIPE 215.0 LF $21.86 260.00 $5,683.60
<br />2504.603 6" PVC WATER SERVICE PIPE 405.0 LF $24,0D 399.00 $9,576.00
<br />2504.603 8" PVC WATER SERVICE PIPE 370.0 LF $27.12 352.00 $9,546.24
<br />2504.602 HYDRANT 5.0 EA $1943.93 6.00 $11663.56
<br />2504.602 4" GATE VALVE & BOX 6.0 EA $707.79 6.00 $4,246.74
<br />2504.602 6" GATE VALVE & BOX 15.0 EA $782.61 15.00 $11,739.1
<br />5
<br />2504.602 8" GATE VALVE & BOX 8.0 EA $1,012.00 8.00 $8,096.00
<br />2504.602 10" GATE VALVE & BOX 1.0 EA $1,472-09 1.00 $1,472.09
<br />2504.602 12" GATE VALVE & BOX 6.0 EA $1,758.89 7.00 $12,312.23
<br />2504.608 WATERMAIN FITTINGS 9,665.0 LB $2.00 10,225.00 $20,450.00
<br />2340.521
<br />EXTRA BITUMINOUS PATCHING PARKING LOT
<br />4" INSULATION FOR WATERMAIN CROSSINGS AT 3 TORM SEWER 170.0 SY
<br />SF $50.57
<br />$3.25 283.00
<br />128.00 $14,311.31
<br />$416.00
|