My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979-02-13
NewBrighton
>
Council
>
Minutes - City Council
>
Minutes 1979
>
1979-02-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2007 5:33:43 PM
Creation date
9/19/2007 2:52:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Council Proceedings <br />City of New Brighton <br />Feb. 13, 1979 <br />Impr. 79-4 Innsbruck North, 2nd Addition <br />The City Engineer reviewed the improvement project <br />and estimated costs. <br />Gene Skiba, resident in the improvement area, <br />raised questions about the deep grade of the <br />land on his and his neighbors properties. <br />Motion by Werdouschegg, seconded by Benke to <br />to close hearing. <br />5 ayes - 0 nayes- carried <br />Motion by Werdouschegg, seconded by Blomquist <br />to waive reading the resolution and adopt <br />RESOLUTION ORDERING IMPROVEMENT AND AUTHORIZING <br />PREPARATION OF PLANS AND SPECIFICATIONS FOR THE <br />PROPOSED CONSTRUCTION OF INNSBRUCK NORTH 2ND ADDITION <br />STREETS AND UTILITIES, PROJECT 79-4. <br />5 ayes - 0 nayes- carried <br />.J <br />Impr 79-4 <br />8:10 - 8:35 <br />RESOLUTION <br />NO. 2162 <br />Impr. 79-7 - 19th and 19A Street <br />____The -City -Engineer -reviewed the improvement. project Impr 79-7 <br />and estimated costs. 8.35 to 9:03 <br />Richard May, 1999 19A Street explained why the <br />houses across,20th Avenue (1934 and 1918) were <br />included in the petition.- He asked if any <br />consideration had been given to utilization of <br />the drain field that is already in the back yard and <br />if the 4" pipe that is there could be used. <br />The City Engineer stated the 4" pipe is not <br />adequate size. <br />Pat Sullivan, 1920 19th Street NW, showed slides <br />of the conditions in the improvement area. <br />John Heine, 1926 19th Street also spoke regarding <br />improvement 79-7. <br />Motion by Janecek, seconded by Blomquist.to close <br />hearing. <br />5 ayes - 0 nayes - carried RESOLUTION <br />Motion by Janecek, seconded by Werdouschegg to waive NO. 2163 <br />reading the resolution and adopt RESOLUTION ORDERING <br />IMPROVEMENT AND AUTHORIZING PREPARATION OF PLANS AND <br />SPECIFICATIONS FOR THE PROPOSED CONSTRUCTION OF 19th AND <br />19A STREET NW STORM DRAINAGE, PROJECT 79-7 <br />5 ayes - 0 nayes- carried
The URL can be used to link to this page
Your browser does not support the video tag.