My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-112
NewBrighton
>
Council
>
Resolutions
>
Resolutions 2004
>
04-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2005 3:33:05 PM
Creation date
7/8/2005 9:51:09 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />New Brighton 2005 Fee Register <br /> <br />Description Bas. Other <br />BUIWING FEES, <br />(I) For inspections not covered herein, or for requested special inspections or services. Ibe fee shall be <br />at $32.00 ver man hour. including traveltime. plus a $.40 ver mile traveled, Vlus the reasonable cost of <br />equivmenl or material consumed. This section is also avplicable to inspection of empty conduits and such <br />jobs as determined by the City. <br /> <br />(g) For inspection of transient projecls. including bUI nollimited to carnivals and circuses. the inspection fee <br />shall be computed as follows: <br /> <br />(I) Power supply units according to 2b of this fee scbednle. A like fee will be required on power <br />suPVly units at each engagement during the season. exceptlbal a fee of $32.00lbour will be <br />charged for additional time spent by the inspeclor, if the power is not ready for inspection as reqnired by law. <br /> <br />(2) Rides, Devices, or Concessions: Shall be inspected atlbeir first lIppearance of lbe season <br />and the inspection fee shall he $25.00 per uuit. In addition to the fee for the power suVply units. there shall <br />be a general inspection for eacb engagemenl durine the season atteb hourly rate. with a two hour minimum. <br />In addition to Ibe above fees, inspections required on Saturdays, Sundays, holiday or after regular business <br />hours will be at the hourly rate, including travel time. An owner of a migratory amusement enterprise shall notify <br />Ibe inspector and make application for inspection a minimum of 14 days before its engagement in new Brighton. <br />When the inspector is not notified at least 48 hours in advance. a charge of $100 will be made in addition 10 all <br />required fees. <br /> <br />(h) For the purposes of interpretation of tbe provisions of this chapler, the most recently publisbed edition of the <br />National Elecrrical Code shall be prima facie evidence of the definitions. interpretations and scope of lbe words and <br />tenus used in this fee schedule. <br /> <br />(i) In addition to the nbove fees, the inspection fee for each separate inspection of a swimming pool shall <br />be computed at $25.00. Reinforcing steel for swimming pools requires a rough-in inspection. <br /> <br />Proposed <br />Z005 <br /> <br />% <br />Change <br /> <br />$57.00 <br /> <br />14% <br /> <br />$30.00 20% <br />
The URL can be used to link to this page
Your browser does not support the video tag.