Laserfiche WebLink
• <br />0 <br />CITY OF NEW BRIGHTON <br />NORTHWEST QUADRANT PHASE I PAGE 2 OF 3 <br />PARTIAL PAYMENT 11 <br />DATE: JANUARY 4, 2008 <br />ITEM SECTION F - STREET INSTALLATION <br />NO ITEM <br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74 <br />$D.OD <br />NO ITEM <br />$0.00 <br />2531.602 PEDESTRIAN CURB RAMP TRUNCATED DOME 18 EA $495.00 <br />$0.D0 <br />SUB -TOTAL <br />$O.DD <br />2112.501 SUB -GRADE PREPARATION <br />110 <br />D ST <br />$302.50 <br />20.45 <br />$6,186.13 <br />2211.501 AGGREGATE BASE, CLASS 7 7" <br />2,900 <br />17 <br />ON <br />$12.50 <br />3,768.99 <br />$47,112.38 <br />2360.5131 WEARING COURSE MIXTURE MVWE45035B <br />U75 <br />ON <br />$60.61$0.00 <br />$0.00 <br />2360.502 NON -WEARING COURSE MIXTURE LVNW350306 <br />1 <br />ON <br />$54.78 <br />1,153.81$63,205.71 <br />$3,251.66 <br />2531.501 CONCRETE CURB AND GUTTER, DESIGN B61B <br />80 <br />LF <br />$10.34 <br />4,760.06$49,219.02 <br />$0.00 <br />2357.502 BITUMINOUS MATERIAL FOR TACK <br />20 <br />GAL <br />$2.48 <br />125.00 <br />$31D.00 <br />EXTRA SUB -GRADE CORRECTION <br />30 <br />LS <br />$3,000.00 <br />1.00 <br />$3,ODD.DD <br />EXTRA MOBILIZATION FOR NORTHDALE STREET CREW <br />188 SHRUBS <br />LS <br />$750.DOI <br />1.00 <br />$750.00 <br />EXTRA MOBILIZATION FOR C & C CONCRETE CO. <br />PLANTS <br />LS <br />$52S.D01 <br />1.00 <br />$625.00 <br />SUB -TOTAL <br />LF <br />$1.93 <br />1 <br />$0.00 <br />$170.608.23 <br />ITEM SECTION G - SIDEWALK AND TRAIL INSTALLATION <br />NO ITEM <br />2521.501 4" CONCRETE SIDEWALK 6,285 SF $3.74 <br />$D.OD <br />2521.511 2" BITUMINOUS TRAIL 256 SY $24.09 <br />i <br />$0.00 <br />2531.602 PEDESTRIAN CURB RAMP TRUNCATED DOME 18 EA $495.00 <br />$0.D0 <br />SUB -TOTAL <br />$O.DD <br />__FTE_M SECTION H - STREETSCAPE INSTALLATION <br />NO ITEM <br />2105.525 TOPSOIL BORROW CV <br />2301.503 CONCRETE PAVEMENT, INTEGRALLY COLORED <br />1,350 <br />650 <br />CY <br />SY <br />$15.50 <br />$86.63 <br />750.00 <br />$O.DO <br />$54,972.50 <br />2301.503 CONCRETE PAVEMENT, CROSSWALK <br />110 <br />SY <br />$69.30 <br />123.00 <br />$8,523.90 <br />2301.604 CONCRETE PAVEMENT, SPECIAL - PAVERS <br />2411.505 CONCRETE STRUCTURE PYLON FOUNDATION <br />2,900 <br />17 <br />SF <br />EA <br />$8.75 <br />$660.00 <br />$0.00 <br />$O,DO <br />2504.602 IRRIGATION SYSTEM CONNECTION <br />1 <br />EA <br />$3,773.DO <br />$0.00 <br />2504.602 UNDERGROUND IRRIGATION SYSTEM <br />1 <br />LS <br />$36,962.00 <br />0.08 <br />$3,251.66 <br />2571.502 DECIDUOUS TREE, 2-1/2" CAL <br />80 <br />TREES <br />$303.60 <br />$0.00 <br />2571.503 ORNAMENTAL TREE, 1-1/2" CAL <br />20 <br />TREES <br />$187.00 <br />$0.00 <br />2571.503 ORNAMENTAL TREE, 8' HT, MULTI -STEM <br />30 <br />TREES <br />$247.50 <br />$0.D0 <br />2571.505 DECIDUOUS SHRUB, #3 CONT <br />188 SHRUBS <br />$29.70 <br />$0.00 <br />2571.507 PERENNIAL, #1 CONT <br />2,556 <br />PLANTS <br />$13.20 <br />$0.00 <br />2571.602 VINYL EDGER <br />350 <br />LF <br />$1.93 <br />$0.00 <br />2575.505 SOD, TYPE LAWN <br />2105.525 EXTRA - TOPSOIL BORROW FROM NORTH PINE WINDROW <br />4,20D <br />SY <br />CY <br />$3.85 <br />$9.00 <br />900.00 <br />$0.00 <br />$8,100.00 <br />SUB -TOTAL <br />$84,848.06 <br />