My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-26-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 02-26-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 9:30:23 PM
Creation date
2/22/2008 5:14:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Costs and Funding: $50,700 has been accrued in the Fleet Replacement Fund for this wheel loader, with <br />annual installments of approximately $12,400 towards replacement. Assuming the 2 -year RDU <br />Equipment program holds true, the City will realize an annual savings of approximately $6,000 plus avoid <br />a one-time expense of $18,650 in wheel and tire maintenance repairs that were forecasted for 2008/2009. <br />Grant M. Wy1fels, P.E. <br />Director of Public Works <br />L� <br />
The URL can be used to link to this page
Your browser does not support the video tag.