Laserfiche WebLink
City of New Brighton <br />GENERAL INFORMATION REGARDING <br />STREET RECONSTRUCTION PROJECTS <br />Streets scheduled for reconstruction in 2008 have been selected based on their age, condition, maintenance <br />history, and requests from residents for the street to be rehabilitated. <br />PROCESS <br />• Informational meeting with property owners within the project area (February, 2008) <br />• Feasibility Report presented to the City Council and Public Improvement Hearing date set <br />• Residents notified of date and time of Public Improvement Hearing <br />• Public Improvement Hearing is held at which time City Council approves or abandons the project <br />(March, 2008) <br />• Preparation of plans and specifications <br />• Advertise for bids <br />• Open bids and award contract <br />• Construction (.lune -September, 2008) <br />• Assessment Hearing (October, 2009) <br />PROPOSED CONSTRUCTION <br />STREET SURFACING will be reconstructed to their original width and city standard 7 ton or 9 ton design. <br />CONCRETE CURB AND GUTTER sections that are badly settled or broken will be removed and replaced. <br />STORM SEWER will be installed where necessary or as required by the City Comprehensive Drainage Plan. <br />WATER AND SEWER UTILITY improvements and repairs will be completed during the early stages of <br />construction as necessary. <br />FINANCING STREET RECONSTRUCTION PROJECTS <br />STREET SURFACING is proposed to be paid for by a combination of a city wide tax, Municipal State Aid <br />Funds, and special assessments against benefiting property owners in the project area. According to the New <br />Brighton Comprehensive Street Plan, 75 percent of the street surfacing and curb and gutter repair is paid for <br />by taxes, and 25 percent of the street surfacing and curb and gutter repair is special assessed. <br />STORM SEWER improvements are proposed to be paid for by the City's Storm Water Management Fund. <br />PRIVATE SEWER AND WATER SERVICE repair costs are the responsibility of the property owner. <br />CITY WATER AND SEWER UTILITY improvements and repairs are proposed to be paid for from the <br />appropriate city utility fund. <br />Please call 651-638-2050 or stop in City Hall and visit with the Engineering Department if you have any <br />questions regarding Street Reconstruction projects. <br />