My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-26-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 02-26-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 9:30:23 PM
Creation date
2/22/2008 5:14:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of New Brighton <br />GENERAL INFORMATION REGARDING <br />STREET RECONSTRUCTION PROJECTS <br />Streets scheduled for reconstruction in 2008 have been selected based on their age, condition, maintenance <br />history, and requests from residents for the street to be rehabilitated. <br />PROCESS <br />• Informational meeting with property owners within the project area (February, 2008) <br />• Feasibility Report presented to the City Council and Public Improvement Hearing date set <br />• Residents notified of date and time of Public Improvement Hearing <br />• Public Improvement Hearing is held at which time City Council approves or abandons the project <br />(March, 2008) <br />• Preparation of plans and specifications <br />• Advertise for bids <br />• Open bids and award contract <br />• Construction (.lune -September, 2008) <br />• Assessment Hearing (October, 2009) <br />PROPOSED CONSTRUCTION <br />STREET SURFACING will be reconstructed to their original width and city standard 7 ton or 9 ton design. <br />CONCRETE CURB AND GUTTER sections that are badly settled or broken will be removed and replaced. <br />STORM SEWER will be installed where necessary or as required by the City Comprehensive Drainage Plan. <br />WATER AND SEWER UTILITY improvements and repairs will be completed during the early stages of <br />construction as necessary. <br />FINANCING STREET RECONSTRUCTION PROJECTS <br />STREET SURFACING is proposed to be paid for by a combination of a city wide tax, Municipal State Aid <br />Funds, and special assessments against benefiting property owners in the project area. According to the New <br />Brighton Comprehensive Street Plan, 75 percent of the street surfacing and curb and gutter repair is paid for <br />by taxes, and 25 percent of the street surfacing and curb and gutter repair is special assessed. <br />STORM SEWER improvements are proposed to be paid for by the City's Storm Water Management Fund. <br />PRIVATE SEWER AND WATER SERVICE repair costs are the responsibility of the property owner. <br />CITY WATER AND SEWER UTILITY improvements and repairs are proposed to be paid for from the <br />appropriate city utility fund. <br />Please call 651-638-2050 or stop in City Hall and visit with the Engineering Department if you have any <br />questions regarding Street Reconstruction projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.