My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-15-2008
NewBrighton
>
Council
>
Packets
>
2008
>
2008 Council Work Session Materials
>
02-15-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 4:28:33 PM
Creation date
3/5/2008 3:40:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The City has designated David Bernard Builders & Developers and Sherman Associates <br />as housing developers for the west side of Old Highway 8. Contracts have been signed, <br />grading and infrastructure work is in process, and on-site marketing efforts have begun. <br />Housing construction is scheduled to begin in spring 2007 and continue into 2008 and <br />2009. <br />The City is working in cooperation with Ramsey County on plans for the upgrade of Old <br />Highway 8 through the NWQ. Expectations are that work will be completed during the <br />2007 construction season. Preliminary plans have been prepared for the design for the <br />road. Landscaped medians, boulevards, and protected turn lanes are included. New <br />signals will be added as required. <br />ENVIRONMENTAL CONDITIONS <br />The Northwest Quadrant is a classic "brownfield" site, with several sizable areas <br />impacted by contamination from previous land uses. The City is working with the <br />Minnesota Pollution Control Agency (MPCA) and will remediate all properties to the <br />standards agreed upon with the agency. The objective is to obtain a "certificate of <br />completion" or comparable protection against further liability from regulators. <br />Throughout the area, small areas of contamination were removed as part of the <br />negotiations for the purchase of each property. There are two substantial remaining areas <br />to be addressed. On the west side of Old Highway 8, petrochemicals from one-time <br />refinery and solvents operations contaminated the soil under a portion of the current <br />Midwest Asphalt property. The MPCA approved a Response Action Plan calling for the <br />complete removal of soil from all contaminated areas, down to approximately two feet <br />below the water table. This work will be completed in 2007, after the acquisition of the <br />Midwest Asphalt property is completed. This contamination does not affect either of the <br />sites proposed herein. <br />On the east side, a substantial portion was used as a private dump for several years in the <br />1960s. The dump contains construction and household debris, and continues to generate <br />methane. The City has prepared a Response Action Plan, which is available for review <br />upon request. The plan proposes substantially reshaping the dump material on-site, <br />covering the material with four feet of clean fill (more in residential areas), and installing <br />perimeter venting systems around all buildings. The agency has approved this plan with <br />some additional conditions. The majority of the dump remediation work is scheduled for <br />early 2007, in preparation for site availability later in 2007. <br />While the dump extends into the proposed office sites in only several small areas, the <br />remediation plan will affect the entire east side of the highway. The reshaping of the <br />dump will result in raising the grades throughout. Developers will need to address <br />structural stability through added support under all buildings. The City is aware of this <br />situation and will respond to proposals accordingly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.