My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-25-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 03-25-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 9:59:27 PM
Creation date
3/21/2008 11:47:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sites that extended into the nearby park area. Also, the City successfully obtained cleanup grants <br />from DEED and Met Council in January 2007 to conduct the soil remediation in Tract 2. <br />Previously, the MCPA Superfund program's position regarding the groundwater contamination at the <br />NW Refinery and Trio Solvent Sites was that it did not present a significant risk to nearby surface <br />water receptors located in the Ramsey County Park. That position was reflected by the fact that <br />MPCA had already de -listed a portion of the NW Refinery Site from Superfund in the park near Long <br />Lake, and MPCA was poised to de -list the Trio Site from Superfund in 2006 following the <br />completion of favorable groundwater monitoring in the park in 2001 to 2005 by Alliant Tech (the <br />responsible party for the Trio Solvent Site). Based on MPCA's approval of the City's planned soil <br />cleanup, and the previous decisions for the Superfund sites, it was believed that the two Superfund <br />sites could be de -listed following the City's soil remediation. De -listing is an important <br />administrative step by MPCA in support of the City's planned residential development. <br />Over the past two years, new developments emerged that have resulted in additional investigations at <br />MW Asphalt, and led to some modifications for the proposed cleanup and redevelopment: <br />1. The developers' geotechnical consultant required very deep excavations to remove a layer of <br />organic soil beneath residences. In order to complete those excavations, a much larger <br />volume of contaminated soil located below the groundwater table would need to be managed <br />involving significant additional costs (especially in the portion of the NW Refinery Area at <br />MW Asphalt). <br />2. In early 2007, the City and the developers decided to abandon plans for residential <br />development of the NW Refinery area (i.e., the northern 8 acres of MW Asphalt), which <br />would avoid the significant costs associated with correction of the poor geotechnical soil in <br />an area of extensive environmental contamination. A revised cleanup plan (September 2007 <br />RAP) was prepared for contaminated soil removal in Tract 2 in support of future residential <br />development, along with construction of a clean cover and future City park on the northern 8 <br />acres at MW Asphalt associated with the NW Refinery Site. <br />3. The September 2007 RAP was approved by the MPCA in October 2007 and the City <br />contracted with Belair Excavating to begin implementing the revised cleanup starting later <br />that month. However, the MPCA later told the City to hold off on placing the clean cover at <br />the NW Refinery Area while they worked with Ashland (the responsible party for the NW <br />Refinery Site) to address their new concerns regarding the NW Refinery Site. <br />4. In 2007, the MPCA also changed their previous position by requiring additional groundwater <br />investigations and they are imposing more stringent groundwater cleanup goals to be further <br />protective of the nearby off-site surface water receptors in the park. The subsequent <br />groundwater investigations were conducted by the City, Ashland, and Alliant Tech in 2007. <br />The results of the groundwater investigation, which are currently under review by MPCA, <br />indicate that petroleum impacts in the park related to the NW Refinery Site exceed the <br />MPCA cleanup goals while the groundwater impacts related to the Trio Solvent Site meet the <br />cleanup goals. <br />At this time, the MPCA has reiterated their approval for the planned soil cleanup in Tract 2 (located <br />south of the NW Refinery) by Belair that will largely be funded by the City's DEED and Met <br />Council Cleanup Grants. The Tract 2 cleanup is expected to resume later this month when the frost <br />subsides and will likely be completed later this spring. <br />C:\Documents and Settings\gferne\Local SettingsUemporary Internet Files\OLK18D\City Council Work Session March <br />2008.doc Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.