Laserfiche WebLink
<br />utilities for the site. It is anticipated that the redevelopment will be completed in 2004. <br />The Beisswenger component of the redevelopment area includes demolition of the <br />existing structures and construction of a 41,362 square foot retail facility also to be <br />constructed in 2004. <br /> <br />6 <br />