My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-08-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 07-08-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:22:11 PM
Creation date
7/3/2008 3:14:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) IS staff assigned to SPFD shall install and configure software, as <br />• described in I.C.1) a) -d), on City of St. Paul servers located in the CAD <br />Computer Center and/or on each Customer Agency provided laptop. This <br />is in order to provide Wireless Network services. IS staff assigned to <br />SPFD will install properly configured software, on Customer Agency - <br />provided laptops at a mutually agreed upon location. <br />C) IS staff assigned to SPFD will install a wireless modem on each <br />Customer Agency laptop. IS staff assigned to SPFD will install <br />connectors and antennae, if the connectors and antennae are needed for <br />wireless services, on each Customer Agency laptop. <br />d) IS staff assigned to SPFD will test all installations and certify that all <br />Services are completed, that Services perform in accordance with the <br />terms of this Agreement and the software manufacturers' users manuals, <br />and that connectivity to the Wireless Network is ready for testing. <br />e) The Customer Agency shall have a 14 -Day Field Test Period to test the <br />connectivity for up to 3 installed laptops; subsequent installation of <br />laptops will not be subject to any field test period and shall be treated as a <br />Continuing Service under this Agreement; <br />• f) During the 14 -Day Field Test Period, IS staff assigned to SPFD will <br />correct any System defects or deficiencies identified by the Customer <br />Agency; the Customer Agency shall telephone the SPFD Helpdesk at <br />651-228-6267 or email to SPFDHelpQci.stpaul.mn.us upon identification <br />of a defect or deficiency; <br />g) Acceptance: the Customer Agency shall accept the Services after the set- <br />up of the initial laptops, expiration of the 14 -Day Field Test Period and <br />correction of defects and deficiencies by the Customer Agency and the <br />SPFD. <br />h) The Customer Agency will be responsible for the physical installation of <br />the laptops tested during the 14 -Day Field Test Period, and for the <br />physical installation of any subsequent additional Customer Agency <br />laptops to the Wireless Network. This service is not within in the scope of <br />the Services under this Agreement. <br />i) Connectivity of the laptops to the wireless service will take place on a <br />schedule to be mutually agreeable to the parties, provided that the initial <br />test laptops will be installed within sixty (60) days of execution of this <br />Agreement by the parties. <br />• j) Subsequent implementation of wireless connectivity for additional <br />laptops will take place over a period of time as requested by the Customer <br />Agency. The maximum number of all operational laptops will not exceed <br />20 units in total used by Customer Agency. <br />JPA City and New Brighton Wireless CAD Agreement Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.