Laserfiche WebLink
<br />, 1--' <br /> , 'f <br />~ . <br />project 5. This project' consists of gradi'ng, c()ri~trtl,cting sanitary sewer, watermain, <br />storm sewer and gravel base, bituminous surfacing, concrete curb and gutter on <br />the following streets: <br />Brentwood Drive from County Road liE" to Heritage Lane <br />Alton Road from Brentwood Drive to 17th Ave. N. W. <br />Cha-than Terrace from Brentwood Drive to 17th Ave. N. W. <br />Heritage Lane from l3rentwood Drive to 17th AVe. N. W. <br />Heritage Court from Heritage Lane to North End <br />Kimberly Drive from Heritage Lane to 3rd St. N. W. <br />Project 6. This project consists of grading and ccmstruction sanitary sewer, watermain, <br />storm sewer, gr::!.vel base, bituminous surf::!.cing, concrete curb and gutter on the <br />following streets: <br />19th St.. from 20th Ave. N. W.. to Long Lake Road <br />19 "A" Street from20th AVe. to Long Lake Road <br />20th Ave. N. W. from 19 "A" Street to Rice Creek Road <br />Project 8. This project con$ists of constructing a storm sewer on the following streets: <br />North Pike Lake Court from 14th St. to South End <br />Drainage easement from North Pike Lake Court to Pike Lake Drive <br />Pike Lake Drive from Frieden Road to 13th Ave. <br />Frieden Road from Pike Lake Drive to West End <br />Drainage easement from Frieden Road to 13th Street <br />13th St. N. W. from Highview to West End <br />(Area Bounded by 15th St. N. W. on North) <br />(Highway 100 on South, 27th. AVe. on West) <br />(Highview on the East) <br />Project 9. This project consists of constructing a storm sewer on the following streets: <br />6th St. from 9th. Ave. N. W. to 14th Ave. N. W. <br />11th Ave. from 6th St. N. W. to 7th St. N. W. <br />(Area bounded by 5th St. N. W. on the South, 7th St. N.W. on the North) <br />(9th Ave. on the East, 13th Ave. on the West) <br />Project 10. This project consists of constructing sanitary sewer on the following <br />streets: <br />7th Street N. W. from 1st AVe. N. W. to 2nd Ave. N. W. <br />8th Street N. W. from 1st Ave. N. W. to 2nd Ave. N. W. <br />Project 11. This project consists of constructing a storm sewer over floW in the <br />drainage easement in the Lake Forest Subdivision. <br />Project 12. This project consists of constructing a watermainacross Interstate 694 <br />at Forest nale itoadand 27th., Avenue. <br />, . . , <br /> -2- <br />