Laserfiche WebLink
<br /> '- ..., ; <br /> ~...... -.. ~ <br /> ~'- . . - " r III <br /> .' "v ' <br /> .. ' ','''' <br /> RESOLUTION NO. 65,...04 <br /> VILLAGE OF NEW BRIGHTON <br /> COuNTY OF RAJ4SEY <br /> STATE OF MINNESOTA <br /> RESOLUTION ORDERING PREPARATION OF REPORT ON UlPROVEMENTS <br /> 64-21 through 23aOO 6.5,...1 through 24 inclusive. <br /> WHEREAS, It isproposed to make the following improvements. <br /> IMPROVEMENT 64-21: <br /> Silver Lake Road from Mississippi St. to Gregory Drive Watermain <br /> installation. <br /> IMPROVEMENT 64-22 : <br /> Willmus Industrial Park <br /> First St.SW fro]):). 8th Ave., to 9th Ave. <br /> Third st. SW fz:om 8th Ave. to 9th Ave. <br /> Ninth Ave. SW from 1st St. to 3rd St. <br /> First st. NW from 8th Ave. to cul de sac <br /> Right-pf-w$.yacquisition, street grad- <br /> ing, sanitary sewer, wa.termain, <br /> storm sewer , grave1b8.se, bitum- <br /> inous surfacing, concrete curb & <br /> gutter. <br /> IMPROVEMENT 64----23: <br /> Inghorest Addition <br /> Fifteenth Ave. NWfrom 1st at. to County Road ''Ell <br /> Fourteenth Ave. NW from. 2nd st. to County Road liE II <br /> ThirteEU1tb.. Ave. NW from 2nd st.. to County Road ''E'l <br /> Sixteenth (Highorest) from 2nd St. to 1st Street <br /> First St" SW from 16th .Ave. to 14th Ave. <br /> SeCond at. SW from 16th Ave. to 13th Ave. <br /> Right-of-way aoquisition, street grad- <br /> ing, sanitary sewer, watermain, <br /> storm sew~, gravel base, bitumin.... <br /> ous su.r:faoing, oonorete ourb & gut- <br /> ter. <br /> IMPROVEMENT 65-1: <br /> Construction of dam. on Rioe Creek <br /> outlet to Long Lake. <br /> IMPROVEMENT 65-2: <br /> Construction ofDa.n1 on County <br /> Ditch No. 2 OUtlet to Pike Lake <br /> IMPROVEMENT 65-3 r <br />