Laserfiche WebLink
<br /> ,'. 'W <br /> ~ . -4 <br /> IMPROVEMENT 65-13: <br /> Pike Lake. Terra.ce <br /> Fredeen Road from Pike Lake D:tive <br /> to cul de sac <br /> Right-of-way acqu1sitiont street grad- <br /> lpg, saIlita1"y sewer, watermaint <br /> storm sewer, grs.ve1 base. bitumin- <br /> oussurfacing, concrete curb and <br /> gutter. <br /> IMPROVEMENT 65-14: <br /> 11th Ave. NW from 7th St. to 8th st. <br /> Street grading and watermain <br /> IMPROVEMENT 65-15: <br /> 2nd, Ave. SE from 1st St. SE to <br /> Stowe Ave. <br /> . . Bitu:lll.ino1l$ surfacing <br /> IMPROVEMENT 65-16: <br /> Mississippi St. from 28th Ave. to <br /> 33rd Ave. <br /> Right-of-way acquisition, street grad- <br /> ing, sanitary sewer, wa.termain.. <br /> storm sewe.r, gravel base, bituminous <br /> surlacing, ooncrete curb and gutter. <br /> IMPROVEMENT 65-19 <br /> 23rd Ave. NW from 8th st. to 9th St. <br /> 8th st. NW from 23rd Ave. to 21st Ave. <br /> 21st Ave. NW from 7th St. to 8th St. <br /> Right-oi-wa.y a.oquisition, street grad- <br /> ing, sanitary seWer, watermain, <br /> storm sewer, gravelbLse, bitum- <br /> inous surfacing, oonc rete curb and <br /> gutter. <br /> IMPROVEMENT 65-20: <br /> 19A St. from Long La.ke Road to 15th Ave. NW <br /> Right-of-way a.cquisition, street grad.- <br /> ing,sa.nita.rysewer , _tarma.in, <br /> stOrtn sewer, gravel base, ltuminous <br /> surfacing, concrete curb a.nd gutter. <br /> IMPROVE~NT 65-21: <br /> Alley.... Block 4, First Addition to New Brig'hton <br /> Right-<l-way acquisition, street gradi;tl.g <br /> and paving. <br /> -3- <br />