<br />- ~
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />NOTICE OF HEARING ON Estimated Cost: $11.297,2'7
<br />IMPROVEMENT BY: acquiring, opening and widening
<br />1969 IMPROVEMENTS street right-of-way, grading, sanitary
<br />VILLAGE OF NEW BRIGHTON sewer, watermain, storm sewer, gravel
<br />Notice is hereby given that the vn~ base, bitam,inous surfacing, concrete
<br />lage Council of the YilIage of New curb and gutter,
<br />Brighton will meet in the Oouncil Cham- Impr, 69-3: Alley b~tween 10th and 11th
<br />bel'S of the ViJlage Hall, 803-5th Ave. Ave from 4th St, NW to 5th St NW
<br />NW at 7 :3,0 p,m, on January 30, 1U~9 Estimated Cost: $1,102.49
<br />to consider the making of the following BY: grading, gravel base and bituminous
<br />improvements: surfacing.
<br />Impr, 69-2: Mississippi St. from Violet Impr, 69-20: Intersection 16th Ave. &
<br />Lane to Thorndale East 18th St.
<br />Estimated Cost: $98,115.51 Estimated Cost: $7.245,91
<br />Impr, 69-4: 1st St, SW from Highcrest Impr, 69-21: Intersection Old Hwy. 8
<br />Rd. west to cuI de sa<: and 8th Ave, NW
<br />Estimated Cost: $20,314,6'6 Estimated Cost: $2.757.2"
<br />Impr. 69-5: 29th Ave. NW from Rice Impr, 69-22: 5th St. from 23rd Ave, to
<br />Creek Rd, to Mississippi St. Silver Lake Road
<br />Estimated Cost: $68.261.20 Estimated Cost: $2'0,7436,0
<br />Impr, 69-6: 14th Ave. NW from CQ. Impr. 69-2!3: Driftwood Rd, from 5th 8t,
<br />Rd. E to 2nd St. NW to Forest Dale Rd. and Driftwood Oircle
<br />Elstimated Cost: $36,00,5.72 & Driftwood Court
<br />Impr. 69-7: 18th Ave. NW from 16th Estimated Cost: $21.319.69
<br />St. NW to 18th St, NW; 17th St. BY: acquisition of right-at-way open-
<br />NW from 17th Ave, NW to 20th Ave, ing. o;radin!", gravel base, concrete
<br />NW curb & gutter and bituminous surfae-
<br />Estimated Cost: $116,006,96 ing,
<br />Impr, 69-8: 6th St. SW from Sunset Imnr, 69-11: Rice Creek Rd, from 6,00
<br />Lane to 8th Ave. SW: 5th St, SW ft, west of Silver Lk, Rd, to Stin-
<br />from 9th Ave. SW to 10th Ave. SW; son Blvd,
<br />9th Ave. SW from Foss Rd. to cuI de Estimated Co~t: ~47 .466.no
<br />sac; 10th Ave. SW from 5th St. SW Impr, 69-13: Rice Creek Rd, from SiI-
<br />to 6th St, SW vel' Lake Rd. to 6:50 ft, west
<br />Estimated Cost: $242,575.56 Estimated Cost: $29.244,77
<br />Impr, 69-9: Pike Lake Court from 1-694 BY: Sanitary Sewer and Watermain
<br />servo Dr. to cuI de aac; 1-694 Serv, Impr. 69-17: East 'h of SW 14 of S~c.
<br />Dr, from Pike Lake Dr. to Pike Lake 32, T 30, R 23
<br />Ct, Estimated Cost: $171.430.91
<br />Estimated Cost: $51.186,57 BY: Sanitary Sewer, Watermain and
<br />Impr. 69-10: Palmer Dr, from Silver Storm Sewer.
<br />Lake Rd. to Highview Dr.; 13th St, The area proposed to be assessed for
<br />NW from Silver Lake Rd, to High- this imnrovement is all that area
<br />view Dr.; Robin Lane from 12th St, lying West of 01d Hwy, 8. North
<br />NW to 13th St, NW; North CO'll't fr(>ffi of County Road "D", South of Fo,s
<br />13th St. to cuI de sa<: Road, and East of McCallum Drive,
<br />Estimated Cost: $133,6;;5,52 Impr 69-18: Eastman Dr, from Silver
<br />Impr, 69-12: 29th Ave. NW from 18th Lake Rd, to Knollwood Dr,
<br />St. NW to Rice Creek Rd; Jargen Estimated Cost: $10.800.84
<br />Court from 29th Ave. NW to cuI de BY: Storm Sewer
<br />sac; Ple~ant View Dr. from 29th The area proposed to he assl"ssed bv
<br />Ave. NW to Rice Creek Rd, this improvement is Lots 1 thru 7
<br />Estimated Cost: $148,495,05 and 14 thru 21. Knollwood Park No,
<br />Impr. 6'9-14: East 'h Stinson Blvd. from 2
<br />18th St NW to Rice Creek Rd.; Stin- Th€ general nature on<l location of tl,e
<br />son Court from Stinson Blvd. to eu] improvements is amnlified in the prelim-
<br />de sac inar:v Engineering Report On file wjth
<br />Estimated Cost: $78,112,96 the VilIao:e Clerk.
<br />ImpI', 69-15: Erin Court from Silver Tho area nroposed to b€ assessed for
<br />Lake Rd, to cui de sa<: such improvements is all iots and tracts
<br />Estimated Cost: $101,591.94 of land abutting streets to be improved
<br />Impr. 69-16: Brentwood Dr. from Herit- except as otherwise noted.
<br />age Lane to 3rd St.; Shalimar Isle All nursuant to Minn. Stats, 429.011 to
<br />from Brentwood Dr, to 3rd St,; Wind- 429.111 (Laws 19-53, Ch, 398 as amended)
<br />SOr Terrace from Brentwood Dr. to Sueh persons as desire to be heard
<br />3rd St. with reference to the proposed improve-
<br />Estimated Cost: $106,560,06 ment will be heard at this meeting',
<br />Impr. 69-19: CuI de sac on 22nd Ave, /s/Yernon Pedenan. C1Hk
<br />south from 1-694 Village of :"'Iew Brighton
<br />(Bulletin: January 16 and 23, 1969)
<br />
|