My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 778
NewBrighton
>
Council
>
Resolutions
>
Resolutions 1970
>
Resolution 778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2008 7:45:55 AM
Creation date
6/24/2008 2:23:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.. <br />~ <br />'. " t I <br /> RESOLUTION NO. 778 <br /> STATE OF MINNESOTA <br /> COUNTY OF RAMSEY <br /> VILLAGE OF NEW BRIGHTON <br />RESOLUTION ORDERING IMPROVEMENT 70-ll;l AS PETITIONED OR WITH A MORE <br />NORTHERLY LOCATION OF THE INTERSECTION OF PALMER DRIVE AND ROBIN <br />LANE AND PREPARATION OF FINAL PLANS AND SPECIFICATIQNS ALSO <br />SUITABLE TRAFFIC CONTROL SIGNS TO EFFECTIVELY MINIMIZE TRAFFIC <br />FLOW INTO PIKE LAKE AREA. <br /> WHEREAS a resolution of the Village Council adopted the lOth <br />da y 0 f Febr,uary, 1970, fixed a date for a council hearing on the <br />:f'ollowingproposed improvement: <br /> Location: Palmer DriveftoIn, ,Silv~rLake Road to Bobin Lane <br /> Type Improvement: Acquisition'of right-of-way, opening, <br /> grading, 'wat.ermq,in, storm sewer, bitumipqus base and <br /> surfaci1'].g " 'concrete curb and gutter. <br /> . ' , <br /> Est.imated Cost: $90,663.66 <br /> AND WHEREAS ten; days published n.otice of hearing through two <br />weekly publications of the required notice and 10 days mailed <br />notice t.o affected propert.y owners was given and the hearing was <br />held on March 17, 1970, at which time all persons desiring to be <br />heard were given an opportunity to be heard thereon, and all <br />objections were heard and passed upon: <br /> NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE VILLAGE <br />OF NEW BRIGHTON: <br /> 1. Such improvement is hereby ordered as proposed in the <br /> Council resolution adopted the 25th day of November 1969 <br /> 2. Milner Carley and Associates is hereby designated as the <br /> engineer for this improvement. He shall prepare plans <br /> and specifications for the making of such improvements. <br />Adopted by the Village Council March 17, 1970. <br /> /' <br /> Mayor <br />ATTEST: <br />~I/~ <br />Vernon Pederson, Clerk <br />(SEAL) <br />
The URL can be used to link to this page
Your browser does not support the video tag.