Laserfiche WebLink
<br />..., <br /> . <br />. <br /> -3- <br />Improvement 77-5: Palmer Drive from 27th Ave. NW to the west limits <br /> of New Brighton (New Street). <br />Estimatea Cost: $439,741. 00 <br />BY: Opening, grading, sidewalks, sanitary sewers, water- <br /> mains, storm sewers, concrete curb and gutter, <br /> aggregate base, bituminous surfacing, and right-of-way <br /> acquisition. <br />proposed Assessable Area: All land abutting Palmer Drive between <br /> 27th Avenue NW ana the west limits of <br /> New Brighton. <br />---------------------------------------------------------------------------- <br />Improvement 77-6: Walker Heights Subdivision on the north side of <br /> Mississippi Street near Long Lake Road (New Plat). <br />Estimated Cost: $ 91,511.40 <br />BY: Opening, grading, sanitary sewers, watermains, <br /> storm sewer, concrete curb and gutter, aggregate <br /> base, and bituminous surfacing. <br />Proposed Assessable Area: All land abutting streets in saia <br /> subdivision. <br />--------------------~----------------------------------------------------- <br />Improv~ent 77-7: Hipp's View Point Addition and 14th Ave. NW <br /> from 16 A Street to Hipp's View Point Aoaition <br /> (New plat ana improvement of street leading to <br /> new plat). <br />Estimated Cost: $78,991.40 <br />BY: Opening, grading, sanitary sewers, watermains, <br /> storm sewers, concrete curb and gutter, aggregate <br /> base, and bituminous surfacing. <br />Proposed Assessable Area: All land abutting street in Hipp's <br /> View Point Addition and all land abuttinq <br /> 14th Ave. NW from 16 A Street to Hipp's <br /> View Point Addition. <br />