My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2045
NewBrighton
>
Council
>
Resolutions
>
Resolutions 1978
>
Resolution 2045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2008 7:46:08 AM
Creation date
6/25/2008 8:20:40 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, ~ <br />. ~ <br /> , 2045 I <br /> RESOLUTION NO. . . <br /> STATE OF MINNESOTA <br /> COUNTY OF RAMSEY <br /> CITY OF NEW BRIGHTON <br /> RESOLUTION ACCEPTING FEASIBILITY STUDY, ORDERING IMPROVEMENT <br /> IN AND AUTHORIZING EXECUTION OF AN AGREEMENT WITH RAMSEY <br /> COUNTY, FOR THE CONSTRUCTION OF STORM SEWER ON OLD HIGHWAY #8 <br /> BETWEEN 6TH STREET S.W. AND 2ND STREET N.W. <br /> WHEREAS, Ramsey County desires to construct and rebuild <br /> Old Highway #8 between 6th Street S.W. and 2nd Street N.W., <br /> and <br /> WHEREAS, storm sewer is proposed to be constructed under <br /> the road improvement which will benefit property outside of <br /> the road right-of-way, and <br /> WHEREAS, Ramsey County has submitted an agreement to the <br /> City of New Brighton to grant approval to the Old Highway #8 <br /> project and to pay for that portion of the cost of the storm <br /> sewer not required for County drainage, and <br /> WHEREAS, a study and report was made by the Engineering <br /> Department of the City of New Brighton reviewing the proposed <br /> improvement and discussing the feasibility of special <br /> assessing the outside of right-of-way portion of the storm <br /> sewer cost against the benefitting properties pursuant to <br /> Minnesota Statutes 429.011 to 429.l11, the estimated cost to <br /> be assessed being $32,460,and <br /> WHEREAS, at the April 25th Council meeting, the City <br /> Council of the City of New Brighton set a public hearing for <br /> May 23, 1978, at 7:35 P.M. to consider the proposed Old <br /> Highway #8 improvements, and <br /> WHEREAS, ten days published notice of the hearing <br /> through two weekly publications of the required notice was <br /> given and the hearing was held thereon the 23rd day of May, <br /> 1978, at which time all persons desiring to be heard were <br /> given an opportunity to be heard thereon. <br /> NOW THEREFORE BE IT RESOLVED by the City Council of the <br /> City of New Brighton, Minnesota: <br /> 1. The report prepared by the New Brighton Engineering <br /> Department reviewing the proposed improvement and <br /> discussing the feasibility of special assessing <br /> the portion of the storm sewer cost not needed for <br /> county drainage is hereby accepted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.