My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-22-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 07-22-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:30:33 PM
Creation date
7/18/2008 3:41:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008-JUL-11 O8:19AM FROM-TMI COATINGS <br />6514520598 T-168 P.002/O02 F-179 <br />City of New Brighton <br />Quote Form for Water Treatment Plant 1 Recoating Package <br />Water Treatment Plant 26 co ting Package = $ 26, 500 <br />L.S. C $ <br />Contractor will be paid a unit lump sum (L.S.) price to complete surface preparation and application <br />of special coatings at the Water Treatment Plant 1, <br />The Bidder' grees to begin work as soon as possibly and have all work completed on or before <br />September 19, 2008. <br />Quote Approved by: <br />Grant M. Wyffels, P.E. <br />Director of Public Works <br />City of New Brighton <br />Date <br />Pagc 2 of 2 <br />Company TMT Coatin s, Inc. <br />By <br />Name nd Title <br />Tracy M. Gliori, President <br />Address 3291 Terminal Dr.. <br />St. Paul, MM 55121 <br />Telephone 651-452-6100 <br />Fax 651-952-0598 <br />
The URL can be used to link to this page
Your browser does not support the video tag.