11 <br />EXHIBIT 7 <br />ADDITIONAL COMMENTS <br />(Source: Minnesota Commercial. Railway) <br />Note to Timetable for Completion of Work <br />MC is working with Magellan to coordinate all work so as to coincide with actual track <br />construction and a temporary road closing — detour.. To avoid having to shut down the <br />pipeline and the flowage for several days, MC and Magellan engineers are working on <br />design of a heavy duty casing to place over the existing pipeline which also will require <br />Raising both the mainline and the new wye track about six inches from current levels so <br />that the depth of the encasement is 4 and one half feet from the rail, in keeping with <br />normal AREMA (American Railroad Engineering and Maintenance) standards for <br />construction. This will require an addition apx. six inch lift of both crossings so they are <br />level and raising the existing mainline to the north of this crossing (and possibly to the <br />south, depending upon the grade level) up to six inches and sloping it off back to level. <br />To minimize the time" of the road closure and provide effective use of construction forces <br />of MC, its contractors, the City and the Pipeline, a high degree of coordination and pre - <br />Construction meetings, and lead time for the construction of the encasement and shipping <br />thereof is required so that a detour road is not built that has to be torn out to raise track, <br />and, that the encasement can arrive and be installed by MC and Magellan at a time where <br />all this can be done concurrently and most effectively and efficiently. <br />As of this date, October 7, 2007, details are incomplete with Magellan but we hope to <br />have them done on a positive note within thirty days, depending upon availability of <br />Magellan engineering staff. <br />Execution Copy (10-5-2007) 14 <br />