My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-08-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 09-08-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:58:29 PM
Creation date
9/5/2008 2:27:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Railroad Memo <br />March 20, 2008 <br />Page 3 <br />Under ideal circumstances, the wye and team tracks would be constructed as part of one project. There <br />are certain economies of scale related to grading and other improvements that would achieve cost <br />savings. In this case, in order to keep the railroad project on schedule it is necessary to break up the <br />project into separate components. As a result, there is an additional cost of $37,000 to perform this <br />work. This figure includes 208 feet of track, a turnout (i.e. switch) and some grading costs. Attached <br />for reference purposes are copies of the Letter of Understanding and a letter from Minnesota <br />Co ercia the cost details. <br />Grant eli <br />Community Development Director <br />• <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.