Laserfiche WebLink
L_J <br />0 <br />• <br />03116/2808 19.29 8478151971 JGU-M M CSN OWS 0 <br />Estimate for Phase I — New $aigbtab Sidi= P.1oo <br />Now — Original emanate of this Cyst by Dave McKauxie which did pet <br />bdiods 209 V=W ttwck fog saWh of swkcb comsebon wkwh <br />Ind bee bud uded in Wye Project, wn S178,468.dv The City <br />Had gpvod to absorb up I* SNOAM of ti6rls cost. See E:. S <br />To dowmi a rids estimaRr, MC used !bis $15%000 as the wdstb* <br />Han od added do following <br />1, 208 fret of additional bwk at $133 per lineal foot <br />2. Cost to dig out sled and sW*mde for ww xWg <br />3. wcwd amund kit ow to lm in Wing at pa =M <br />Ymcdou with Wyc to s" id baving to dig tett now <br />Tics and ftpbm bow an (cost would be a wash <br />TUM Iota for tuucnout tie loft) <br />Total oft $34,664.00 <br />8% eoatiuuSency 2,773.00 <br />TOW 37.437 <br />Plus $150,000 07,437 <br />S27,6b4 <br />4.000 <br />3,000 <br />Now I -au wigW agmenucat (esdbit 0 allowed an ad&dmd ltl3b over <br />Hda tag costs f tim-- ficipaNd"o6w incus ed. coos. s. MC wowd <br />Have to wswe this any also be payable under the -1 psnisdi <br />AeweaaghaveearaitnUme kwhvadcs for anceflawi fm fm <br />M wWs, o., s1dough we are doing our We to avoid (Sea left <br />To &ace xnd Kadrylk of RIdIw it m dated 3/1719 <br />MC has given. XWhvodm the tae to bid thb portion to enmw <br />Rmohdog an dsm with this pwjeot and to mitigWe cion <br />Chaim Out boat adoWo vm and Raiz nAm am perrfvur o all <br />Suoh vwai& within the 197,437 plus 10% In &c <br />Unlllwly wieat *q cs=4 the City and RWIway aptec to use <br />BM i fAbO" of good frith to wo* vcd addW nal %mdin given <br />The hdd $78.000 WxdM wfjcb ** Railway had 4pat to <br />Absasb.. <br />PACE 15 <br />,7i7-,, f�'" P- ;I <br />