My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-10-2008
NewBrighton
>
Council
>
Packets
>
2008
>
CCP 11-10-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2018 12:41:28 AM
Creation date
11/7/2008 1:30:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF NEW BRIGHTON CONTRACTOR: <br />ER11199FRING DEPARTMENT VEIT & COMPANY, INC. <br />14000 VEIT PLACE <br />SEPTEMBER 29, 2008 ROGERS, MN 55374 <br />763-428-2242 <br />CHANGE ORDER 2 <br />PROJECT 07-5, OLD MILLER DUMP CLOSURE PLAN <br />PURPOSEIDESCRIPTION: INCORPORATE CHANGES RESULTING FROM MNDOT'S REVIEW AND COMMENTS OF STORM WATER <br />DISCHARGE TO THE 1694 DRAINAGE DITCH. THESE CHANGES WERE REQUIRED AS A CONDITION OF THE MNDOT PERMIT. <br />MNDOT REQUIRED THE FOLLOWING: 1) UPSIZE THE DOWNSTREAM -MOST PIPE REACH FROM 30" TO 36"; 2) REDUCE SLOPE <br />ON DOWNSTREAM -MOST PIPE REACH FROM -0.6% TO -0.3%; 3) REPLACE RIP-RAPAPRON WITH PERMANENT <br />TURF -REINFORCEMENT -MAT (TRM) APRON; 4) INSTALL 3 - 36" RCP BEND SECTIONS WITH STEEL TIES AT DOWNSTREAM END <br />OF OUTLET PIPE. 5) REPLACE 30" FES WITH 36" RCP SAFETY APRON PER MNDOT STD. PLATE 3022. <br />ACTION: THE FOLLOWING CHANGES ARE HEREBY MADE TO THE CONTRACT DOCUMENTS: <br />REVISED PLAN SHEET C-09 DATED SEPTEMBER 29, 2008 IS INCLUDED IN THIS CHANGE ORDER, ALL WORK ASSOCIATED <br />WITH THESE ITEMS SHALL BE PAID FOR AT ESTABLISHED UNIT PRICES AND CONSIDERED COMPENSATION IN FULL <br />FOR ALL MATERIALS AND LABOR REQUIRED TO COMPLETE WORK. <br />ESTIMATED UNIT <br />ITEM QUANTITY PRICE TOTAL <br />REVISE PLAN QUANTITIES (1)-(4) <br />1) UPSIZE THE DOWNSTREAM -MOST PIPE REACH FROM 30" TO 36" (REVISE PLAN QUANTITIES) <br />ITEM 84 - REDUCE 30" REINFORCED CONCRETE PIPE CL III (RCP) FROM 574 LF TO 418 LF. <br />ITEM 87 - INCREASE 36" REINFORCED CONCRETE PIPE CL III (RCP) FROM 45 LF TO 201 LF. <br />2) REDUCE SLOPE ON DOWNSTREAM -MOST PIPE REACH FROM -0.6% TO -0.3% <br />NO CHARGE FOR THIS PLAN CHANGE <br />3) REPLACE RIP -RAP APRON WITH PERMANENT TURF -REINFORCEMENT -MAT (TRM) APRON <br />ITEM 42 - REDUCE RIP -RAP - MNDOT CLASS IV FROM 16 TN TO 0 TN. <br />ITEM 43 - INCREASE PERMANENT TURF REINFORCEMENT MAT (TRM) FROM 710 SY TO 755 SY. <br />4) INSTALL 3 - 36" RCP BEND SECTIONS WITH STEEL TIES AT DOWNSTREAM END OF OUTLET PIPE <br />ITEM 87 - TO BE PAID AS 36" RCP PER LF. <br />ADD THE FOLLOWING ESTIMATED QUANTITIES TO THE CONTRACT DOCUMENTS: (5) <br />5) REPLACE 30" FES WITH 36" RCP SAFETY APRON PER MnDOT STD. PLATE 3022 <br />ITEM 86 - DELETE 30" RCP FLARED END SECTION W/STEEL TRASH RACK 1 EA $3,150.00 $3,150.00 <br />CONTRACT CHANGE -1 LF $3,150.00 ($3,150.00) <br />NEW CONTRACT PRICE 0 $0.00 <br />ADD ITEM 36" RCP SAFETY APRON STD PLATE 3022 1 EA $3,550.00 $3,550.00 <br />(MARKER TO BE INCIDENTAL) <br />NET CHANGE IN CONTRACT PRICE $400.00 <br />TOTAL AMOUNT OF CHANGE ORDER 2 $400.00 <br />ORIGINAL CONTRACT AMOUNT $4,552,943.25 <br />PREVIOUS CHANGE ORDERS $600,000.00 <br />CONTRACT PRICE PRIOR TO CHANGE ORDER $5,152,943.25 <br />NET INCREASE OF CHANGE ORDER $400.00 <br />NEW CONTRACT PRICE WITH CHANGE ORDERS $5,153,343.25 <br />CHANGE IN CONTRACT TIME NO CHANGE <br />APPROVED BY: J�_ DATE li Lob <br />GRANI WYf EELS, <br />DIRECTOR OF PUBLILIRKS <br />CITY OF NEW BRIGH <br />APPROVED BY: DATE IO C90 Da <br />& COMPANY, INC. <br />APPROVED BY COUNCIL ACTION: OCTOBER 14, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.