Laserfiche WebLink
0 <br />CITY OF NEW BRIGHTON <br />ENGINEERING DEPARTMENT <br />NOVEMBER 14, 2008 <br />CONTRACTOR: NORTH PINE AGGREGATE <br />14551 LAKE DRIVE <br />FOREST LAKE, MN 55025 <br />651-464-6802 <br />FAX 651-464-8456 <br />CHANGE ORDER 5 <br />S.A.P.147-020-33 <br />PROJECT 07-3, OLD HIGHWAY 8 RECONSTRUCTION <br />ACTION: ADD THE FOLLOWING ENVIRONMENTAL CLEANUP ITEMS TO'SCHEDULE G" - ENVIRONMENTAL <br />REMEDIATION OF THE CONTRACT. <br />REASON: CHANGE ORDER 4 ADDED THE REMOVAL AND HANDLING OF CONTAMINATED SOIL AND WASTE MATERIALS <br />FOUND WHILE INSTALLING THE SANITARY SEWER. CHANGE ORDER 5 ADDS THE COST OF HAULING AND DISPOSAL <br />OF THE SAME MATERIAL. <br />ITEM OUANTITY UNIT PRICE TOTAL <br />ADD TO SCHEDULE G OF THE CONTRACT <br />1 Transport and Dispose of Contaminated Soils and 572.94 TON $13.36 $7,654.48 <br />Waste Materials <br />TOTAL OF ITEM 1 <br />$7,654.48 <br />ACTION: ADD THE FOLLOWING WATER SYSTEM ITEMS TO *SCHEDULE D" - WATERMAIN IMPROVEMENTS <br />OF THE <br />CONTRACT. <br />$2,795,034.49 <br />REASON: THE FOLLOWING MISCELLANEOUS WATERMAIN ITEMS WERE NOT ANTICIPATED DURING THE <br />PROJECT <br />DESIGN PHASE AND NEED TO BE ADDED TO THE PROJECT AT THIS TIME. <br />$2,SN,1996.71 <br />ADD TO SCHEDULE D OF THE CONTRACT <br />2 1-1/2" Corp with Saddle 1 EA $276.62 <br />$276.62 <br />3 1-1/2" Curb Stop with Box and Rod 1 EA $300.85 <br />$300.85 <br />4 1-1/2" Copper Pipe 67 LF $21.31 <br />$1,427.77 <br />5 Remove Hydrant 1 EA $302.50 <br />$302.50 <br />TOTAL OF ITEMS 2 THROUGH 5 <br />$2,307.74 <br />TOTAL OF CHANGE ORDER 5 <br />$9,962•22 <br />ORIGINAL CONTRACT AMOUNT <br />$2,735,342.56 <br />TOTAL AMOUNT OF CHANGE ORDERS 1 THRU 4 <br />$59,691.93 <br />CONTRACT AMOUNT PRIOR TO CHANGE ORDER 5 <br />$2,795,034.49 <br />AMOUNT OF CHANGE ORDER 5 <br />$9,962.22 <br />NEW CONTRACT AMOUNT WITH ALL CHANGE ORDERS <br />$2,SN,1996.71 <br />CHANGE IN CONTRACT TIME NO CHANGE <br />APPROVED BY: <br />---�/— J /A J --- — <br />GRANT FFELS,P <br />DIRECTOR OF PUBLI J ORKS <br />CITY OF NEW BRIGHT <br />APPROVED BY: <br />NORTH PINE AGGREGATE <br />APPROVED BY COUNCIL ACTION:, <br />DATE= 111 l7 ag <br />DATE <br />