My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 01-27-2009
NewBrighton
>
Council
>
Packets
>
2009
>
2009 Council Work Session Materials
>
WS 01-27-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 6:57:47 PM
Creation date
1/23/2009 3:54:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKSESSION MATERIALS <br />hBR19M <br />Ur (11y that 4rrAiS f(w you <br />Memo <br />To: New Brighton City Council <br />From: Sandy Breuer, Director of Parks and Recreation <br />Subject: Consideration of Family Service Center Roof onditions <br />Date: January 23, 2009 <br />Staff is requesting an opportunity to present to council the current condition of the Family <br />Service Center roof and a recommendation on how to proceed. <br />The Family Service Center roof was installed in 1994 when the building was constructed. In <br />2009 the roof will be 15 years old and has shown consistent increases in the amount of leaks <br />taking place each year. In addition, a recent safety inspection with Loss Control Services found <br />the concrete walk -way pavers to be a "trip and fall hazard" and recommend the removal and <br />replacement of all broken pavers. All warranties for the roof have expired and the increases in <br />repair costs are difficult to endure in the Family Service Center operating budget. <br />Staff has worked with three architectural firms to secure quotes to formally evaluate the current <br />conditions of the family service center roof and to recommend a course of action to be taken. <br />The roof is scheduled in the non -fleet replacement plan as having a 15 year life cycle and is <br />budgeted for a replacement cost of $225,000. An initial estimate by an architectural firm has <br />offered a probably construction cost of $185,000. <br />Staff recommendation is for council to authorize a feasibility study for the Family Service Center <br />roof at the February 10, 2009 council meeting under the consent agenda. <br />Attachments: <br />PowerPoint presentation <br />Architectural service quote: Bonestroo <br />Architectural service quote: Inspec <br />G:\DATA\FSC\WP\FSC\Purchases\RooFrenovation\memo-workse ion.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.