My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-10-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 02-10-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 9:15:38 PM
Creation date
2/6/2009 3:59:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />XceiEnergy' <br />Statement of Work Requested <br />DATE: December 1, 2008 <br />WORK REQUESTED BY City of New Brighton (Grant Wyffels) <br />WORK TO BE AT Old Hwy 8 and 14'' St. NW <br />ADDRESS 803 Old Highway 8 NW <br />New Brighton, MN. 55112 <br />CONSISTING OF: Final billing for relocating overhead, and changing some of the existing <br />overhead lines to an underground system near the intersection of Old Hwy 8 and 14`'' St. NW. <br />Xcel Energy installed 5 new poles, approximately 700' of new underground cable and relocated an <br />existing overhead gang -operated switch and capacitor bank. <br />Total cost for Xcel Energy work in 2008 $71,348.08 <br />Cost that it would have taken to move existing overhead - $33,902.09 <br />$37,445.99 <br />0 Please return signed form, and check for $37,445.99. <br />The facilities installed or removed by the Company shall be the property of the Company and any payment <br />by customer shall not entitle customer to any ownership interest or right therein. <br />The undersigned hereby requests and authorizes Northern States Power Company, d/b/a Xcel Energy to <br />do the work described above, and in consideration thereof, agrees to pay <br />thirty seven thousand four hundred forty five and 99/100 ($ 37,445.99 <br />in accordance with the following terms: payment to be returned before the end Credit Approval <br />of December 2008 <br />Receipt of the above amount hereby acknowledged on behalf of Xcel Energy by <br />XCEL ENERGY Customer City of New Brighton (Grant Wyffels) <br />By By <br />FOR XCEL ENERGY USE <br />Xcel Energy Rep. B. J. Grant Division WBL Xcel Energy Proj. No. 11148757 <br />Const. $ 37.445.99 Rein. $ Maint. $ _ Oper. $ Transf. $ Total $ 37.445.99 <br />Form 17-7012 (6-01) Original — Division Accounting Copy — Customer Copy — Division Distribution Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.