My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
0764
NewBrighton
>
Council
>
Ordinance
>
Adopted
>
0700-0800
>
0764
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 11:06:02 AM
Creation date
2/25/2009 2:07:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not injure or adversely affect the adjacent area or property values. The Planning <br />nission, in making a recommendation, and the City Council, in acting upon the <br />it use permit, shall consider the following factors: <br />A. The application for special use permit shall be processed according to Chapter <br />8 of the Zoning Code. <br />B. Applications for special use permits must meet the standards of Section 4••600 <br />(2), A -I. <br />C. Wireless telecommunication towers/antenna may be constructed to a height <br />that exceeds the required setback up to 33%. As a condition of approval, the City <br />must be provided with a licensed professional engineer's certification that the <br />tower is designed to collapse or fail within a distance or zone shorter than. the <br />required setback distance as determined by the height of the structure or <br />telecommunication tower. The required setback is specified in Section 4-60C (2), <br />A -B. <br />D. Certain telecommunication towers/antenna may be exempt from the setback <br />requirement of Section 4-600 (2) and instead subject to a 10' setback: by <br />authorization of the City Council and when all of the following criteria are met: <br />1. The tower/antenna is erected on a parcel zoned I-1 or 1-2. <br />2. The tower/antenna is located in a side or rear yard. <br />3. The reduced setback is measured only from the 1-35W right-of-way. <br />4. The applicant submits a fall zone letter stating that tower is engineered <br />to fall in a distance not impeding traffic on 1-35W. <br />this 22nd day of July, 2008. <br />TTl✓ST: _ '" _ <br />aniel A; Maiers,, Director of Finance <br />JLfid Support Srryi. asf City Clerk <br />Steve Larson, Mayor <br />[Underline indicates proposed language; St-r-ikegffough indicates deleted language] <br />
The URL can be used to link to this page
Your browser does not support the video tag.