Laserfiche WebLink
<br />Tow.lu'RiKs i.,Ca <br /> <br />, <br /> <br />Waste-to-Energy Equipment <br />2 - Loaders <br />Air Pollution Equipment <br />Tri Pack 3 CS-20001 Radiant <br />Installed and Operating <br />Engineering and Contingency <br />Total <br /> <br />$ 42,500 <br />300,000 <br /> <br />Sections <br /> <br />3,300,000 <br />400,000 <br />$4,042,500 <br /> <br />Electrical Generation Equipment <br />2 Turbine Generators 1500 KW Each <br />1 Stearn Condenser <br />Piping and Valves, and Erection <br />Electrical <br />Engineering and Contingency <br />Total <br /> <br />$ 500,000 <br />10,000 <br />50,000 <br />25,000 <br />75,000 <br />$ 660,000 <br /> <br />Standby Boil ers <br />100,000 Gal. Oil Tank <br />2 - 23,000 lb./hr. Boilers <br />Total <br /> <br />$ 100,000 <br />200,000 <br />$ 300,000 <br /> <br />St earn P ipi ng <br />Pipe <br />Engineering and Contingency <br />I Total <br /> <br />~ Grand Total <br /> <br />$1,005,000 <br />100,000 <br />$1,105,000 <br /> <br />$7,576,360 <br /> <br />All of the above information was supplied by the engineering <br />firm of Toltz, King, Dwvall, Anderson and Associates Incorporated. <br /> <br />I <br /> <br />- 10 - <br />