Laserfiche WebLink
<br />. __'l\.~o <br />.~, <br /> <br />ur'ew <br />I tJDri9hton <br /> <br /> <br />January 15, 1981 <br /> <br />. <br />N <br />.- <br />.- <br />It'l <br />It'l <br /><t. <br />r- <br />o <br />C/.l <br />UJ <br />2': <br />2': <br />~ <br /> <br />2': <br />o <br />r <br />J: <br />o <br />a: <br />00 <br />~ <br />UJ <br />Z <br /> <br />~ <br />2': <br /> <br />I <br /> <br />... <br />U"l <br /> <br />M <br />o <br />CD <br /> <br />2': <br />o <br />l- <br />I: <br />o <br />a:: <br />CD <br />~ <br />I.U <br />Z <br />u... <br />o <br />>- <br />I- <br />U <br /> <br />I <br /> <br />RE: <br /> <br />PROPOSED IM?ROVEMENT 81-2 FOSS ROAD STORM SEWER <br /> <br />Dear New Brighton Propel'ty Owner <br /> <br />The New Brighton City Council has been petitioned by the Lakeside Mobile <br />Home Park to construct a storm sewer along Foss Road to eliminate the <br />existing drainage ditch. An engineering study has been made of this <br />proposal and a public hearing set for 7:40 P.M., January 27th, 1981 at <br />the New Brighton City Hall. See enclosed "Notice of Hearing on <br />Improvement". <br /> <br />The engineering study states that the <br />engineering standpoint and would cost <br />within the drainage area are proposed <br />below if the project is constructed. <br /> <br />proposal is possible from an <br />an estimated $132,500. Properties <br />to be special assessed as listed <br /> <br />LAND USE <br /> <br />ESTIMATED ASSESSMENT RATE <br /> <br />Industrial and Commercial <br />Mobile Home Park <br />City Street Right-of-Way <br />City Park Land <br />Single Family Residential <br /> <br />$984/Acre <br />$984/Acre <br />$984/Acre <br />$492/Acre <br />$492/ Acre <br /> <br />Residential lots in the Apache Hills area are typically ~ of an acre in <br />area equaling an estimated assessment of $123 per lot. <br /> <br />The drainage area for this proposed project is generally that area north <br />of County Road "0", west of Old Highway #8, southeasterly of the 500 <br />Line Railroad tracks and east of the City of St. Anthony. <br /> <br />If you would like any additional information on this proposed project <br />prior to the public hearing please call the New Brighton Engineering <br />Department at 633-1533. <br /> <br />NEW BRIGHTON ENGINEERING DEPARTMENT <br />