My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-28-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 04-28-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 10:50:12 PM
Creation date
4/24/2009 3:20:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br />Compensation <br />Compensation for leasehold interest in the Subject <br />$ 54,000 <br />Property <br />Compensation for trade fixtures purchased by City, <br />$ 74,200 <br />as set forth in Exhibit C <br />Reimbursement of appraisal costs <br />$ 481.25 <br />Reimbursement of costs to insure the Subject <br />$ .00/month <br />Property during the period between commencement <br />of the lease for the Relocation Site and <br />relinquishment of possession of the Subject Property <br />Reimbursement of rent paid for the Subject Property <br />$ 23.19/day <br />after the commencement of the lease for the <br />Relocation Site, at the rate of $23.19 per day <br />Out of Pocket costs incurred to a third party to locate <br />Actual costs as determined reasonable <br />Relocation Site; negotiate lease for Relocation Site <br />and necessary to a maximum of $2,500. <br />Out of pocket costs incurred to a third party to <br />Actual costs to extent determined <br />confirm appropriateness of Relocation Site, survey <br />reasonable and necessary, not to exceed <br />and environmental investigation of Relocation Site, <br />$24,000. <br />design and engineer telecommunications facility for <br />Relocation Site, and to obtain necessary approvals <br />for development of telecommunications facility on <br />Relocation Site <br />Costs to deliver, set up and demobilize temporary <br />Actual costs to the extent determined <br />cell site (cellular on wheels) during relocation of cell <br />reasonable and necessary, not to exceed <br />site <br />$21,000 - <br />Costs to remove and relocate the equipment and <br />Actual costs to the extent determined <br />shelter and related items listed in Exhibit B, <br />reasonable and necessary, not to exceed <br />including the costs for a new foundation for the <br />$27,600. <br />equipment shelter. <br />Costs to install new tower, including foundation and <br />Actual costs to the extent determined <br />all construction costs, but not including cost of the <br />reasonable and necessary, not to exceed <br />tower itself_ <br />$39,300 - <br />Costs to make the relocated cell site operational, <br />Actual costs to the extent determined <br />including costs to acquire and install all necessary <br />reasonable and necessary, not to exceed <br />cable, antennas, utilities, radio equipment and <br />$13,800. <br />grounding equipment. <br />cr:2428965 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.