My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 05-04-2009
NewBrighton
>
Council
>
Packets
>
2009
>
2009 Council Work Session Materials
>
WS 05-04-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 7:26:06 PM
Creation date
5/1/2009 2:04:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />City of New Brighton <br />Family Service Center <br />Inspec File No.: 211071 <br />April 16, 2009 <br />Page 3 <br />CONCLUSIONS <br />The roof is at or near the end of its design life. The installation of the details was poor and significant <br />ponding would require removal of approximately one-quarter of the roof membrane to install tapered <br />insulation. It is our opinion that the City would be best served by replacing the roof membrane. The <br />following are some figures to assist you in making a decision. <br />PRELIMINARY OPINION OF PROBABLE REPAIR COST <br />+ Adding roof edge strain relief and securement 920 If @ $30 ..... -........................ 28,000 <br />• Replace 25% of roof and add insulation to improve drainage ............ $ 85,000 <br />• Replace walkway pavers (approximately 2,000 sf)......................... ........... 16,000 <br />$129,000 <br />This is a fairly large investment into a roof system that is near or has exceeded its design life. <br />Preliminary opinion of probable replacement cost for a <br />ballasted EPDM roof system including 10% existing insulation <br />replacement, tapered insulation, not including raising rooftop units .................... -.•___..._.$310,000 <br />Preliminary opinion of probable cost for mechanical work ......................... ....... $ 40,000 <br />Preliminary opinion of probable construction cost including all new and <br />tapered insulation for a built-up roof system, ........ I .............................. I..........---...._---•-••- $500,000 <br />REQ$ <br />This report is a summary of our pre -design survey. Neither the survey nor this report is intended to <br />cover structural or mold -related issues. If you should have any questions regarding this report or <br />require additional information, please feel free to contact our office. <br />ni cnl� r , <br />Enclosures: Photographs, Roof Plan, Detail, and Engineer's Report <br />As .a rnuaml protection to die!nts. The puhlic: and INSPEC, all reports are submiof,d a: the confidential property of clients arld ;Jur <br />written authort7.atim is necessafy u, puhli;h any statements, conclusions or extracts born or re ,ardin{; our reports <br />
The URL can be used to link to this page
Your browser does not support the video tag.