Current Non -Fleet Status
<br />Updatc 5/21 /09
<br />Printec 5/22/09 15:29
<br />Current
<br />Projected
<br />Cash 2020 Projected
<br />Replacement
<br />Date
<br />Replacement
<br />Balance Surplus/(Deficit)
<br />Year AssetDescription
<br />Acq'd Life
<br />Cost
<br />12/31/2008 % Funded Assume 3% annual incr
<br />2008 Radar Units (6 units)
<br />2001
<br />7
<br />13,000
<br />2008 Tactical Equipment
<br />2003
<br />5
<br />20,000
<br />2008 replace Varda Alarm
<br />2008
<br />7
<br />5,000
<br />2008 squad car emergency light bars
<br />2008
<br />6
<br />22,000
<br />2009 mp5 machine guns (8)
<br />2009
<br />12
<br />20,600
<br />2009 Lidar Radar
<br />1996
<br />6
<br />5,100
<br />2010 Speed Cart -(Not Fleet)
<br />2000
<br />10
<br />19,100
<br />2010 Lidar Radar
<br />2004
<br />6
<br />5,300
<br />2011 Exercise Equipment
<br />2005
<br />6
<br />27,300
<br />2014 In -Squad Videos
<br />2008
<br />6
<br />25,000
<br />2014 TaserX-26
<br />2008
<br />6
<br />31,100
<br />2015 Handguns all officers
<br />2005
<br />10
<br />36,300
<br />2019 Security System
<br />2004
<br />15
<br />338,000
<br />2019 Fire Range Equipment
<br />2004
<br />15
<br />139,100
<br />2019 Training room tv monitors & equipment
<br />2004
<br />15
<br />48,100
<br />2024 Roof
<br />2004
<br />20
<br />248,000
<br />2029 Generator
<br />2004
<br />25
<br />86,400
<br />2030 Furniture
<br />2004
<br />25
<br />522,900
<br />Sub -total Police
<br />1,617,300
<br />386,076 23.87% (862,509)
<br />Public Works (shared)
<br />2009 Garage Security System Inc/ interior &exterior c 1993
<br />15
<br />31,700
<br />2009 Hand held utiilty meter reading device
<br />10
<br />6,000
<br />2009 Hand held utiilty meter reading device
<br />10
<br />6,000
<br />2011 GARAGE FURNACE - Public Works -$12,881 1991
<br />20
<br />49,900
<br />2012 Replace brake lathe
<br />1996
<br />20
<br />9,200
<br />2012 Replace champion air compressor
<br />1996
<br />16
<br />6,100
<br />2013 replace 2 post axle engaging truck hoist
<br />1992
<br />15
<br />46,000
<br />2014 Hotsy pressure washer
<br />2007
<br />7
<br />6,500
<br />2014 Gate & operator for PW
<br />1994
<br />20
<br />28,800
<br />2015 Garage lot paving
<br />1995
<br />20
<br />102,300
<br />2015 replace norton saw
<br />2000
<br />7
<br />5,800
<br />2015 Snowblower "for trackless MT"
<br />2008
<br />7
<br />10,600
<br />2017 Diesel Fuel Station (3,000 Gallon)
<br />1992
<br />25
<br />33,200
<br />2017 replace trenchbox lite shield
<br />1997
<br />20
<br />14,900
<br />2019 replace mechanic tool box
<br />1999
<br />20
<br />9,600
<br />2020 replace trench box
<br />2000
<br />20
<br />16,000
<br />2023 replace 2 post car & light truck hoist
<br />2008
<br />15
<br />15,700
<br />2027 PW Maint Bldg Floor
<br />2007
<br />20
<br />17,200
<br />2028 JIB crane
<br />2003
<br />25
<br />18,900
<br />2028 Air handler/heater in truck bay
<br />2003
<br />25
<br />50,300
<br />2029 Furnace/AC for Maint Bldg offices
<br />2004
<br />25
<br />32,000
<br />2032 PW Office Furniture - NEW ITEM Financing TB 2007
<br />25
<br />31,300
<br />Sub -total Public Works
<br />548,000
<br />151,422 27.63% (359,951)
<br />
|