Laserfiche WebLink
FROM (TUE)APR 7 2009 11 :27/ST. I7 :27/Mv- 7150000010.'Ci P 2 <br />April 7, 2009 Qwest. <br />City of New Brighton Spirit of Service® <br />Grant Wyffels <br />File #: 42143 <br />Dear Mr. Wyffels, <br />We have received information from the Qwest Field Engineer for the New Brighton, MN <br />area, Pat Slavik, indicating that you have requested a cost estimate relocate cable and <br />fiber facilities at Old HWY 8 and 14`h ST NW in New Brighton, MN. Work will consist <br />of placing 450 feet each of 600 and 900 pair buried cable, 450 feet of 96 strand fiber, 400 <br />feet of conduit and 450 feet of inner -duct. Cable/fiber placement will require directional <br />boring, trenching, and pulling cable/fiber/inner-duct through conduit. This includes all <br />associated splicing and testing activities. This work falls into the excess construction <br />category which is billable back to the customer. <br />Before we can begin construction, it will be necessary for you to agree to the following <br />terms for the facility relocation. Your cost will be $60,573.32 which includes $16,244.78 <br />for materials and $44,328.54 for labor. <br />Please note that this proposal can be withdrawn if it is not accepted within 30 days. <br />If you have questions regarding the actual work required and the construction timeframe, <br />please call Pat Slavik at (651) 730-1365. If you would like to proceed, please call me at <br />(612) 381-5556 to have a contract forwarded to you from the Resource Allocation. Group <br />in Littleton, CO. <br />PLEASE NOTE The contract will need to be signed and returned with a check or <br />signed and dated purchase order before the work can begin. <br />Thank you, <br />aE aito <br />Sue Cotton <br />Qwest --- Special Construction <br />2800 Wayzata Blvd, Room 300 <br />Minneapolis, MN 55405 <br />• <br />