Partial Pay Request No. 2
<br />,South Water Tower Painting"
<br />1,000,000 Gallon Elevated
<br />City of New Brighton, MN
<br />•
<br />Item value
<br />Work completed
<br />1 -- Mobilization
<br />$20,000
<br />$20,000
<br />2 - Exterior coating application -4400,000
<br />A Containment
<br />130,000
<br />$104,000
<br />B Surface Preparation
<br />100,000
<br />90,000
<br />C Primer
<br />60,000
<br />54,000
<br />D Intermediate
<br />50,000
<br />E Topcoat
<br />50,000
<br />F Logo
<br />10,000
<br />3 - Dry Interior coating application -$190,000
<br />A Surface Preparation
<br />100,000
<br />$100,000
<br />B Primer
<br />45,000
<br />45,000
<br />C Topcoat
<br />45,000
<br />45,000
<br />4 - Wet Interior coating application -4160,000
<br />A Surface preparation
<br />80,000
<br />$80,000
<br />B Primer/stripe
<br />30,000
<br />30,000
<br />C Intermediate
<br />25,000
<br />25,000
<br />D Topcoat
<br />25.000
<br />25,000
<br />5 - Repairs
<br />A Replace Bowl man way
<br />7,000
<br />$7,000
<br />B New Gasket in riser man way
<br />n/c
<br />n/c
<br />C 3 Painter's rings
<br />15,000
<br />15,000
<br />D Roof vent, frost -free aluminum
<br />7,000
<br />7,000
<br />E 3 roof man ways above new painter's rings
<br />10,000
<br />10,000
<br />F Double door in base of fluted column
<br />8,000
<br />8,000
<br />G Overflow screen
<br />n/c
<br />n/c
<br />H Additional Riser man way (30")
<br />7,000
<br />7,000
<br />1 Remove and grind all roof clips/angles
<br />1,000
<br />1,000
<br />J Two additional ladder rungs to access tube
<br />1,000
<br />1,000
<br />K Grind all nail heads etc. along lower
<br />1,000
<br />1,000
<br />column
<br />•
<br />
|