My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 08-25-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 08-25-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:48:23 PM
Creation date
8/21/2009 3:02:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />0 <br />0 <br />CITY OF WW NRIOWMW <br />ENGINEERING DEPARTMENT <br />(651)636-2060 <br />PROJECT NO. 04, CLEVELAND AVENUE UFT fSTAIM 7 A FORCEYAN EVROVENEM <br />PAIlTU1L. PAYMENT 1 <br />DATE: AUGUST 13.2008 <br />CONTOACT011: ELLINGSON COMPANIES <br />55113 STATE HIGHWAY 56 <br />WEST CONCORD, MN WIM <br />PHONE: (507)527-2294 <br />FAX: (507)527-2296 <br />F <br />-4 iai <br />ESTIMATEDQUANTITY <br />QUANTITY UNIT PRICE <br />TOTAL BID <br />ITEM <br />QUAN <br />UNIT <br />THIS PAYMEN TO DATE <br />BID <br />AMOUNT <br />M <br />Mgng&1 TION <br />1 <br />LS <br />1 1 <br />TRAFFIC CO <br />1 <br />LS <br />1 1 <br />3 <br />VALVE VAULT <br />1 <br />LS <br />1 1 <br />324.950.001 <br />4 <br />pREPARATfON A POLYUREA GQATING OF LIFT STATION <br />1 <br />LS <br />1 1 <br />S13.917.95 <br />$13,917.96 <br />5 <br />PREPARATION a POLY EA COAIING OF OUTLET MANHOLE <br />1 <br />LS <br />1 1 <br />5 <br />6 <br />RE REPLACE R PAVEMENT <br />1 <br />L <br />0 0 <br />6.55 <br />.00 <br />7 <br />TREE <br />EA <br />1 1 <br />1 <br />164 <br />5 <br />6" HOPE F N PIPE SDR 17 TRENCHL <br />1955 <br />LF <br />I 1 1965 <br />$28.64 <br />$55.99120 <br />9 <br />POLY PIG EXIST** FORCEMAIN <br />1 <br />LS <br />1 1 <br />38,5W.001 <br />s4m.00 <br />10 <br />SELECT G-RANULAT BORROW 10 <br />1.120 <br />CY <br />129.20 <br />Sli.30 <br />$1.459A <br />11 <br />BITUMINOUG.PARKING LOT PATCHING <br />600 <br />SY <br />0 <br />22toi <br />.00 <br />12 <br />81 US PATCHING LEVELAND AVE. <br />250 <br />sy <br />168 168 <br />$35.08 <br />f§.803.44 <br />13 <br />RgMgVE 5 R RETE CURB 6 GUTTER <br />15 <br />LF <br />0 0 <br />t44,98 <br />30-00 <br />14 <br />DI E OF 1 lu#21 TEAM SOILS C <br />800 <br />Cy <br />48 48 <br />$6.52 <br />$312.M <br />15 <br />§jLT F9KE, PRE EMBLED <br />260 <br />LF <br />0 0 <br />p-.09 <br />16 <br />LET T TION <br />3 <br />FJA <br />1 1 <br />$127.00 <br />$127. <br />17 <br />TOPSOIL 1"EM (W <br />250 <br />Y <br />0 0 <br />$17.50,.00 <br />18 <br />PE LAWN <br />1,200 <br />-BY <br />0 <br />.00 <br />19 <br />4" THICK POLYSTYRENE INSULATION <br />400 <br />SF <br />32 32 <br />1.69 <br />1 <br />8A <br />HDPE F RCEMAIN PIPE sm 11 R NCL" <br />11,750,50 <br />TOTAL OF WORK TO DATE <br />$134,134.20 <br />LESS RETAINAGE (5%) <br />$6.700.71 <br />SUB -TOTAL <br />$127,427.49 <br />LESS PREVIOUS PAYMENTS <br />TOTAL OF PARM PAYMENT 1 <br />$127 27.49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.