Partial Pay Request No. 3
<br />"South Water Tower Painting"
<br />1,000,000 Gallon Elevated
<br />City of New Brighton, MN
<br />Item value Work completed
<br />1 - Mobilization $20,000 $20,000
<br />2 - Exterior coating application --$400,000
<br />A Containment
<br />130,000
<br />$130,000
<br />B Surface Preparation
<br />100,000
<br />100,000
<br />C Primer
<br />60,000
<br />60,000
<br />D Intermediate
<br />50,000
<br />50,000
<br />E Topcoat
<br />50,000
<br />45,000
<br />F Logo
<br />90,000
<br />10,000
<br />3 - Dry Interior coating application --$190,000
<br />10,000
<br />F
<br />A Surface Preparation
<br />100,000
<br />$100,000
<br />B Primer
<br />45,000
<br />45,000
<br />C Topcoat
<br />45,000
<br />45,000
<br />4 - Wet Interior coating application -4160,000
<br />7,000
<br />1
<br />A Surface preparation
<br />80,000
<br />$80,000
<br />B Primerlstripe
<br />C Intermediate
<br />30,000
<br />25,000
<br />30,000
<br />25,000
<br />D Topcoat
<br />25.000
<br />25,000
<br />6 - Repairs
<br />A
<br />Replace Bowl man way
<br />7,000
<br />$7,000
<br />B
<br />New Gasket in riser man way
<br />n/c
<br />n/c
<br />C
<br />3 Painter's rings
<br />15,000
<br />15,000
<br />D
<br />Roof vent, frost -free aluminum
<br />7,000
<br />7,000
<br />E
<br />3 roof man ways above new painter's rings
<br />10,000
<br />10,000
<br />F
<br />Double door in base of fluted column
<br />8,000
<br />8,000
<br />G
<br />Overflow screen
<br />n/c
<br />n/c
<br />H
<br />Additional Riser man way (30")
<br />7,000
<br />7,000
<br />1
<br />Remove and grind all roof clipslangles
<br />1,000
<br />1,000
<br />J
<br />Two additional ladder rungs to access tube
<br />1,000
<br />1,000
<br />K
<br />Grind all nail heads etc. along lower
<br />1,000
<br />1,000
<br />column
<br />0
<br />
|