My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-13-2009
NewBrighton
>
Council
>
Packets
>
2009
>
CCP 10-13-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2018 12:24:31 AM
Creation date
10/9/2009 3:12:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Formula #2 <br />Cumulative Advances -< (Grant) x (percentage of Project completed) <br />Section 6.02 Draw Requisitions. Whenever the Public Entity desires a disbursement of <br />a portion of the Granit, Which shall be no more often than once each calendar month, the Public <br />Entity shall submit to the State Entity a Draw Requisition duly executed on behalf of the Public <br />Entity or its designee. Each Draw Requisition shall be submitted on or between the Is' day and <br />the 15d' day of the month in which an Advance is requested, and shall be submitted at least 7 <br />calendar days before the date the Advance is desired. Each Draw Requisition with respect to <br />construction items shall be limited to amounts equal to; (i) the total value of the classes of the <br />work by percentage of completion as approved by the Public Entity and the State Entity, plus (ii) <br />the value of materials and equipment not incorporated in the Project but delivered and suitably <br />stored on or off the Real Property in a manner acceptable to the State Entity, less (iii) any <br />applicable retainage, and less (iv) all prior Advances. <br />Notwithstanding anything herein to the contrary, no Advances for materials stored on or off <br />the Real Property will be made by the State Entity unless the Public Entity shall advise the State <br />Entity, in writing, of its intention to so store materials prior to their delivery and the State Entity <br />has not objected thereto. <br />-At the time of submission of each Draw Requisition, other than the final Draw Requisition, <br />the Public Entity shall submit to the State Entity such supporting evidence as may be requested <br />is by the State Entity to substantiate all payments which are to be made out of the relevant Draw <br />Requisition or to substantiate all payments then made with respect to the Project. <br />At the time of submission of the final Draw Requisition which shall not be submitted <br />before completion of the Project, including all landscape requirements and off-site utilities and <br />streets needed for access to the Real Property and, if applicable, Facility and correction of <br />material defects in workmanship or materials (other than the completion of punch list items) as <br />provided in the Construction Contract Documents, the Public Entity shall submit to the State <br />Entity; (i) such supporting evidence as may be requested by the State Entity to substantiate all <br />payments which are to be made out of the final Draw Requisition or to substantiate all payments <br />then made with respect to the Project, and (ii) satisfactory evidence that all work requiring <br />inspection by municipal or other governmental authorities having jurisdiction has been duly <br />inspected and approved by such authorities, and that all requisite certificates of occupancy and <br />other approvals have been issued. <br />If on the date an Advance is desired the Public Entity has complied with all requirements of <br />this Agreement and the State Entity approves the relevant Draw Requisition and receives a <br />current construction report from the Inspecting Engineer recommending payment, then the State <br />Entity shall disburse the amount of the requested Advance to the Public Entity. <br />Section 6.03 Additional Funds. If the State Entity shall at 'any time in good faith <br />determine that the sum of the undisbursed amount of the Grant plus the amount of all other funds <br />• committed to the Project is less than the amount required to pay all costs and expenses of any <br />kind which reasonably may be anticipated in connection with the Project, then the State Entity <br />Generic GO Bond Proceeds 22 Ver — 6/26/08 <br />Grant Agreement for Construction Grants (Gnrc GO GA-Cnstretn Grnt) <br />