My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WS 01-12-2010
NewBrighton
>
Council
>
Packets
>
2010
>
2010 Council Work Session Materials
>
WS 01-12-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 6:54:21 PM
Creation date
1/8/2010 3:20:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Plans and specifications shall be approved by the city councils of New Brighton and <br />Saint Anthony prior to releasing an advertisement for bids. Contract award to the lowest <br />responsible bidder will be conducted by Saint Anthony. <br />5. Construction engineering, including bid openings, contract administration, other <br />agency submittals, staking, and contract management shall be performed by Saint Anthony. <br />6. Construction observation for water and sewer improvements will be the <br />responsibility of the City whose system is being improved. For Example, New Brighton watermain <br />improvements will be observed by a city of New Brighton representative and constructed to its <br />design standards. Saint Anthony watermain improvements will be observed by a city of Saint <br />Anthony representative and constructed to its design standards. <br />7. Construction observation for street, sidewalk, and storm sewer improvements will be <br />the responsibility of Saint Anthony. <br />8. All monthly progress payments to the contractor for any Improvements shall be <br />reviewed and agreed upon by both New Brighton and Saint Anthony project representative prior to <br />release of payment. Final contract payment shall occur only after final acceptance of the <br />Improvements by the city council of New Brighton and the city council of Saint Anthony. <br />9. Saint Anthony shall invoice New Brighton for reimbursement of New Brighton's <br />portion of the costs of the Improvements in accordance with this Agreement. <br />SECTION B <br />COST ALLOCATION <br />I. Final Design Costs <br />a. Each party will pay 50% of design costs for the Improvements. The final <br />design costs of the Improvements shall include, but not be limited to the following: data collection, <br />preparation of drawings and exhibits, and preparation of plans and specifications. Saint Anthony <br />will contract for these final design services with an engineering consulting firm, WSB and <br />Associates, Inc. (WSB). WSB will invoice the City of Saint Anthony directly for this work. The <br />estimated total cost of the New Brighton portion of the final design related expenses described is <br />$40,000. <br />2. Project Administration Costs <br />a. Each party will pay 50% of the project administration costs for the <br />Improvements. The project administration costs for the Improvement shall include, but not be <br />limited to the following: bidding, contractor contracts, project management, pay vouchers, and <br />change orders. Saint Anthony will contract for these project administration services with WSB. <br />WSB will invoice the City of Saint Anthony directly for this work. The estimated total cost of the <br />New Brighton portion of the project administration related expenses described is $8,500. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.