Laserfiche WebLink
Memo — Silver Lane Worksession <br />January 12, 2010 <br />Page 2 of 2 <br />types of engineering services provided by a consultant or a group of consultants can be <br />grouped into Basic Services and Special Services. <br />Basic Services for Design and Construction of Projects <br />• Preliminary Design Phase <br />• Final Design Phase <br />• Bidding or Negotiating Phase <br />• Construction Phase <br />Special Services <br />Special services required during the study, design, or construction phases of a project may <br />include investigations, reports, and activities beyond the scope of the basic services. Examples <br />of Special Services are: <br />• Geotechnical engineering & testing. <br />• Land surveys, establishment of boundaries and monuments, preparation of easement <br />descriptions, and related computations and drawings. <br />• Topographic surveys for design and construction. <br />• Mill, shop, or laboratory inspections of the materials and equipment. <br />• Resident engineering construction services. <br />• Redesign to reflect changes requested by the client or necessitated by the client's <br />acceptance of substitutions proposed by the contractor. <br />• Assistance to the client as an expert witness. <br />• Preparation of detailed applications and supporting documents for government grants or <br />advances for public works projects. <br />• Preparation of environmental documents. <br />• Architectural or other interdisciplinary services. <br />Attached are excerpts from ASCE Manual 45 that elaborate on Basic and Special Services. <br />Also, I used the ASCE Cost Curves on pages 13 & 15 to determine if the proposed consulting <br />fees are reasonable. <br />From Page 15, based on a project cost of $774,722 and an average complexity project, the <br />design fees should be approximately 6.5%. The estimated design fees are 7.1%. It is my <br />opinion that the proposed design fees are reasonable and consistent with ASCE Manual 45. <br />Attachments <br />Excerpts from Section III of ASCE Manual 45 <br />Cooperative Agreement <br />Resolution 09-085 <br />0 <br />