My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EDC 03-16-2010
NewBrighton
>
Commissions
>
Commissions-OLD
>
EDC
>
EDC Packets
>
2010
>
EDC 03-16-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2018 1:56:27 AM
Creation date
3/12/2010 3:21:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Constrained budgets <br />• Traditionally we have built additional <br />capacity to meet demand <br />• Additional capacity was largely <br />unimpeded by fiscal or physical <br />constraints <br />• Many major projects carried over from <br />plan to plan <br />• Metro highway system is largely in <br />place <br />Roadway construction funding <br />•80% of Mn/DOT Metro road <br />construction program required for <br />preserving aging highways and basic <br />safety projects <br />•20% of Metro program, or $900 <br />million, left for capacity and major <br />safety investments <br />0 <br />0 <br />• <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.