My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-23-2010
NewBrighton
>
Council
>
Packets
>
2010
>
CCP 03-23-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 9:45:07 PM
Creation date
3/19/2010 4:37:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
&t <br />RAK Construction, Inc. MCI', <br />An Affirmative Action, Equal Opportunity Employer <br />EA <br />RAK Construction purposes to furnish labor and material to complete the work as follows: <br />WIC Improvements: <br />Description <br />DATE March 2, 2010 <br />17100 Hwy 65 Suite # 2 <br />Bid # 8727C <br />Ham Lake, MN 55304 <br />Customer ID NB -Brad <br />Phone (763) 434-4210 Fax(763)434-8380 <br />Customer # 651-638-2147 <br />3. New walls and patches <br />brad. martens@newbrightommn. gov <br />Bid To: <br />Prepared by: Roxy <br />City of New Brighton <br />$875.00 <br />Family Service Center <br />$980.00 <br />400 10th Street NW <br />$480.00 <br />New Brighton, MN. 55112 <br />Attn: Brad Martens <br />$1,400.00 <br />RAK Construction purposes to furnish labor and material to complete the work as follows: <br />WIC Improvements: <br />Description <br />AMOUNT <br />WIC Improvements: <br />1. Demo, VCT, Walls, Carpet, Ceilings <br />$1,984,00 <br />2. New ceilings 2 x 2 regular tile <br />$1,250.00 <br />3. New walls and patches <br />$3,480.00 <br />4. New VCT, skim floor <br />$2,100.00 <br />5. Painter - all walls and doors <br />$875.00 <br />6. New door, reuse hardware, installed window kit <br />$980.00 <br />7. ( 2 ) Sprinkler heads, dropped to new. ceiling <br />$480.00 <br />8.( 1) New diffuser$525.00 <br />9. Plumbing - cap ( 1 ) sink, install (1 ) new touchless faucet <br />$1,400.00 <br />10. New 36" base cabinet with P -Lam top <br />$375.00 <br />11.,,Electric = drop smoke, rework light, switches, power, cubical power <br />$2,900.00 <br />12. ( 2 ) Closets with HC wood doors and locks painted to match <br />$825.00 <br />13. Dumpster <br />$375.00 <br />14. Permit <br />$250.00 <br />15. Dust control <br />$175.00 <br />16. Clean up <br />$300.00 <br />17. Supervision <br />$500.00 <br />4% OH&P on Subs <br />$381.00 <br />10% OH&P on Materials and Labor. - <br />$924.00 <br />TOTAL <br />$20,079.00 <br />Time and Materials not to exceed <br />This proposal may be withdrawn or prices may be subject to change if not accepted within 30 days. <br />If you have any questions concerning this quotation, contact Randy Pederson 763-434-4210 <br />Yours truly <br />RAK Construction Inc. Acceptance of Proposal <br />/RO4 "-S� The work described above is approved by: <br />Signed: <br />Randy Pederson <br />President Date: <br />randy.pederson(a)-rakconstruction.com <br />Thank you for the opportunity to quote this work <br />
The URL can be used to link to this page
Your browser does not support the video tag.