Laserfiche WebLink
permit application. The City Council, prior to official action, may submit the application and all <br />supporting data and analyses to the Federal Emergency Management Agency, the Department of <br />Natural Resources, or the Planning Commission for review and comment. Once the Floodway <br />and Flood Fringe boundaries have been determined, the City Council shall refer the matter back <br />to the City staff who shall process the permit application consistent with the applicable provisions <br />of Section 10-040 and 10-050 of this Chapter. <br />¢uacu acvlV UJI <br />gen determined in accordance with 40 roved FEMA methods if available. If the I% annual <br />A.n'P A.,..A ole...,.:,._, U-_ _— t___ . . _ <br />aauuim.aWt 1V1 V1C <br />determination for the 1% annual chance flood elevation in accordance with approved FEMA <br />methods. <br />B. The applicant shall be resmonsible to submit one copy of the above information to a <br />annual chance flood elevation 0 00 -year flood elevations) Procedures consistentlwith Minnesota <br />Regulations 1983 Parts 6120.5000 — 6120 6200 and 44 Code of Federal Regulations Part 65 shall <br />he follnwed ,n th,c <br />�..._... Lo <br />Natural Resources' Area Hydrologist prior to commencing the analysis wullcul om <br />C. Once the 1%annual chance flood elevation (100 -year flood elevation has been determined <br />the Zoning Administrator shall Process the Permit Application consistent with the 4pplicabie <br />provisions of Section 10-040 and 10-050 of this Chanter. <br />(Ord. No. 581, 6-11-91; Code of 2001) <br />10-070 Subdivisions. <br />(1) eview Criteria. No land shall be subdivided which is unsuitable by reason of flooding, inadequate <br />dra j iage, water supply, or sewage treatment facilities. All lots within the Flood Plain Districts shall <br />con t iin a building site outside of the Floodway District at or above the Regulatory Flood Protection <br />Elevation. All subdivisions shall have water and sewage treatment facilities that comply with the <br />pro Bions of this Chapter and have road access both to the subdivision and to the individual building sites <br />no I c wer than two feet below the Regulatory Flood Protection Elevation. For all subdivisions in the flood <br />plain,the Floodway and Flood Fringe boundaries, the Regulatory Flood Protection Elevation, and the <br />req ed elevation of all access roads shall be clearly labeled on all required subdivision drawings and <br />platt4ng documents. <br />(2) oodway/Flood Fringe Determinations in the General Flood Plain District. In the General Flood <br />Plai 1 District, applicants shall provide the information required in Section 10-060 (2) and Section 10-060 <br />bou�this Chapter to determine the 100 year flood elevation, the Floodway and Flood Fringe District <br />aries and the Regulatory Flood Protection Elevation for the subdivision site. <br />(3) oval of Special Flood Hazard Area Designation. The Federal Emergency Management Agency <br />(Underline reflects new language, St4kedffough reflects deleted language) <br />