My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 06-08-2010
NewBrighton
>
Council
>
Packets
>
2010
>
CCP 06-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:08:09 PM
Creation date
6/4/2010 1:27:47 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lb <br />cf Report Number 10-139 <br />( Agenda Section VIS <br />rr<au ram waesm-wu Council Meeting Dace June 2010 <br />REQUEST FOR COUNCIL CONSIDERATION <br />ITEM DESCRIPTION: CONSIDERATION OF PARTIAL PAYMENT 2 FOR PROJECT <br />09-9 OLD HIGHWAY 8 NW WATERMAEN UPGRADE <br />DEPARTMENTHEAD'SAPPROVAL: GxW <br />CITY MANAGER'S APPROVAL: <br />No comments to Supplement ibis Comments mmched <br />Recommendation: To approve Partial Pam at fm Project 09-9, Old Highway 8 NW Watermain Upgrade <br />in the total amount of$ 49,3]2.02 m G.M. ntracting, Inc. <br />Legislative History: Theproject plans and specifications were approved by Council on August 11 and a <br />contract was awarded to GM Contracting, Inc. on September 22, 2009. Change Order 1 reconnecting the <br />water service at the hotel parking lot was approved on November 24, 2009. <br />Financial Impact: Please sen attached payment breakdown for details. <br />Explanation: As part of the Old Highway 8 Reconstruction project, a 12 -inch watemuin was contracted <br />from 1-694 and exreadedjun past he Long Lake Regional Park entrance. This project consists of extending <br />the 12 -inch watermain from the park enhance to the eximarg 8 inch waturnan south of Applewood Point at <br />Highway96. The 2,8001inear feet ofnew watemmin is being directionally drilled along the west side of Old <br />Highway 8. <br />Also, included in this project is the consa aen of an access trail m the existing sanitary sewer that runs <br />parallel b and west ofhe new, entertain. <br />The provisions of the contract with stipulate that the City makes a partial payment to the contractor at least <br />on" each month m regular intervals on the basis of the work performed during that preceding much. <br />Caste and Funding: The wateragam has been programmed in he water rates and will be traded from he <br />Winer Improvement fund. The access trail will be forded from he Sanitary Sewer Improvement food. <br />Grein M. Vy�• P.E. <br />Director of Public Works <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.