My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-13-2010
NewBrighton
>
Council
>
Packets
>
2010
>
CCP 07-13-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 11:25:37 PM
Creation date
7/9/2010 4:02:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />• <br />AII"Report Number 10-162 <br />Agenda Section VI -6 <br />the city that works for you Council Meeting Date July 13, 2010 <br />REQUEST FOR COUNCIL CONSIDERATION <br />ITEM DESCRIPTION: CONSIDERATION OF APPROVAL OF CITY PROJECT 10-14,757- <br />767 2ND AVENUE NW STORM SEWER CONSTRUCTION <br />DEPARTMENT HEAD'S APPROVAL: (0~ <br />CITY MANAGER'S APPROVAL: �{ 1 <br />No comments to supplement this report Comments attached <br />Recommendation: To authorize City Project -10-14,757-767 2"d Avenue NW Storm Sewer Construction <br />and accept the proposal from Stepaniak Construction Company in the amount of $7,770 for this work, <br />and authorize a total budget of $15,000 for this project. <br />Legislative History: N/A — On May 11, 2010 the City Council authorized City Project 10-13, 131 / 2nd <br />Avenue NW Alley Sanitary Sewer Repair. <br />Financial Impact: We received six proposals for this project: <br />1. Stepaniak Construction Co. <br />2. Dave Perkins Contracting, Inc. <br />3. Northdale Construction Co Inc. <br />4. Penn Contracting, Inc. <br />5. MATTCO <br />6. Valley Rich Co. Inc. <br />$7,770.00 <br />$9,930.00 <br />$11,364.63 <br />$14,295.00 <br />$14,376.60 <br />$18,265.60 <br />Explanation: During City Project 10-13, it was determined that a low area existed at the rear of lots 757- <br />767 2"d Avenune NW. With no storm sewer in place, standing water and potential flooding concerns are <br />present during the freeze/thaw cycle in the spring and large storm events. The City of New Brighton <br />received six quotations to install a storm sewer to alleviate this drainage concern. An easement will be <br />acquired between lots 757-767 to install 140 feet of 12" PVC storm sewer, and a catch basin will be <br />added in 2"d Avenue over the existing storm sewer. The street and green areas will be restored upon <br />completion of the storm sewer installation. <br />Costs and Funding: The total cost of this project will be funded from the capital stormwater <br />improvement fund in the amount not to exceed $15,000. <br />Stepaniak Construction Co. <br />$7,770.00 <br />Street Repair <br />$1,000.00 <br />Subtotal: <br />$8,770.00 <br />Project Contingency (10%) <br />$877.00 <br />Easement <br />$1,200.00 <br />Legal Fees <br />$500.00 <br />In-house Eng & Admin ($2,000+$1,000)$3,000.00 <br />Total: <br />$14,347.00 <br />t I. Wyff E. <br />Director of Pub Works <br />Attachment — Plan dated 6-21-2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.